CORDIS proporciona enlaces a los documentos públicos y las publicaciones de los proyectos de los programas marco HORIZONTE.
Los enlaces a los documentos y las publicaciones de los proyectos del Séptimo Programa Marco, así como los enlaces a algunos tipos de resultados específicos, como conjuntos de datos y «software», se obtienen dinámicamente de OpenAIRE .
Resultado final
This deliverable will capture the final stage of the derived requirements on Modular Platforms, the derived architecture and specification, also incorporating feedback from the early implementation stages of the Onboard Platform Demonstrator in WP 36
Documentation of Freight specific user requirements for automation process (se abrirá en una nueva ventana)This deliverable will contain a set of documents defining user freight specific user requirements for all automation process subproject tasks e.g., automatic functions, ATO GoA 3/4 specification, safe perception system and remote driving
List of use case definitions and requirements (se abrirá en una nueva ventana)Requirements and use cases for development, engineering, commissioning, maintenance and refurbishment in the context of DevOps and architectural evolution
Operational Requirements and System Capabilities of ASTP System (Use Cases) (se abrirá en una nueva ventana)The deliverable summarizes the operational needs identified already in other projects outside Europe´s Rail and integrates necessary updates in order to ensure completeness as well as alignment with the System Pillar
List of use cases for the Onboard Communication Network (se abrirá en una nueva ventana)Use cases from the perspective of all relevant stakeholders (manufacturers, sub system suppliers, railway undertakings)
Train Integrity and Train Length Architecture & Functional Requirements (WP19) (se abrirá en una nueva ventana)This deliverable contains all the requirements specified and consolidated in the task 19.1
Intermediate Modular Platform requirements, architecture and specification (se abrirá en una nueva ventana)This deliverable will capture an intermediate stage of the derived requirements on Modular Platforms, and the derived architecture and specification, for instance serving as input to the Onboard Platform Demonstrator in WP 36
Automation Processes collaboration map (se abrirá en una nueva ventana)This deliverable will provide a comprehensive list of interfaces and exchanged items between this subproject and other internal and external stakeholders
Set of requirements on the Digital Register in FP2-R2DATO (se abrirá en una nueva ventana)In this deliverable, all functional and non-functional requirements on the Digital Register, as needed by the various parts of the rail system developed in R2DATO, will be captured
Operational use cases collection (se abrirá en una nueva ventana)Collection of operational uses cases for demonstration of DATO in urban environment
Documentation of use cases for automating functions (se abrirá en una nueva ventana)This deliverable will contain a report about actual existing and specified automatedfunctions, tasks or related use cases with annotated target component as scope, a draft release for set of documents including analysis based on first input from SP and related Fas (e.g., regarding demonstrators) and definition for relevant use cases, operational parameters and scenarios in scope of passenger/freight and tramway applications
Autonomous Route Setting (AnRS) conceptual studies: use case list and concept definition (se abrirá en una nueva ventana)As a result of Task 48.1, this deliverable will provide the definition of autonomy in rail operation, use Cases, available or specified architectures, interfaces and technologies and required missing technologies. Track side concept, functional and technological concept as well as initial approach for demonstration for AnRS
Collection of test cases and validation criteria (WP42) (se abrirá en una nueva ventana)Collection of test cases and validation criteria for autonomous movement of tramways in depot demonstrator
Assessment of the need for an early EGNOS service (se abrirá en una nueva ventana)Requirements specification to FA1 WP 8/9 (se abrirá en una nueva ventana)
Report on requirements specification to FA1 WP 8/9
Requirements and specifications on the Data Factory (se abrirá en una nueva ventana)Requirements collection and specification of the Data Factory
Documentation of Use Cases for remote driving (se abrirá en una nueva ventana)This deliverable will contain a set of documents including analysis based on first input from SP and related Fas (e.g., regarding demonstrators) and definition for relevant use cases, operational parameters and scenarios in scope of passenger/freight/inspection vehicles and tramway applications
Moving Block Specifications applying a train-centric approach (se abrirá en una nueva ventana)This deliverable will contain the results of the system definition (Task 13.2), requirements allocation (Task 13.3) and safety analysis tasks (Task 13.4)
Demonstrator specification (se abrirá en una nueva ventana)Detailed specification of the demonstrator, incl. requirements, logical and physical architecture, implementation plan, etc.
Documentation of use cases for perception system (se abrirá en una nueva ventana)This deliverable will provide a list of use cases and their expected behaviour which in turn will be translated to develop the requirements for the Perception system – required for Automatic Train Operation in Mainline/Regional Line/Stabling & Shunting, Freight and Urban/Light Rail applications
ATO GoA3/4 Specifications review documentation (se abrirá en una nueva ventana)This deliverable will contain a review of existing specifications and previous projects outcome. Analysis of gaps (e.g. for freight) and inputs from the System Pillar will be part of the deliverable too
Documentation of urban user cases and operational rules for automation process (se abrirá en una nueva ventana)This deliverable will contain a set of documents defining harmonized urban use cases and operational rules for all automation process subproject TE
Demonstrator implementation phase 1 concluded and test results consolidated (se abrirá en una nueva ventana)Summary of the implementation phase 1, incl. a detailed description of the implemented modules, a summary of the conducted tests and their results, and a consolidation of the key learnings at this stage
List of solution candidates (se abrirá en una nueva ventana)Concrete candidates of technologies for OSI layer 3-6 and for assoc. basic services
Lessons learnt report on approval processes for automated tramways (se abrirá en una nueva ventana)Guideline for future approval processes in urban environment
Consolidate prior research works incl. Proposal on integration of ACS components in FRMCS (se abrirá en una nueva ventana)In this report, it will be described how prior and ongoing activities on FRMCS and ACS relate, how a maximum extent of synergies among the concepts can be leveraged in the remainder of this WP, and how ACS concepts going beyond the FRMCS architecture and functionality can prospectively be integrated into the FRMCS system
Collection of test cases and validation criteria (WP41) (se abrirá en una nueva ventana)Collection of test cases and validation criteria for remote driving of tramways demonstrator
Proposal on TSI202x, SS147 (se abrirá en una nueva ventana)Proposal for Subset 147 of TSI202x for Onboard Communication Network (aka One Common Bus) on layer 1-6
Specification of the Digital Register implementation(s) required in FP2-R2DATO (se abrirá en una nueva ventana)In this deliverable, all concrete Digital Register implementations that will be needed for different demonstrators, and for other Technical Enablers such as Data Factory, will be specified
Analysis of applicability of solution approaches within the railway vehicle domain (se abrirá en una nueva ventana)Report on the applicability of approaches on evolvability from other domains, e.g. IT systems
HL3 System Specification with identification of use cases and related engineering rules (se abrirá en una nueva ventana)This document summarises the HL3 system specification, HL3 use cases and engineering rules
Documentation of Use cases, requirements & Specification autonomous operations for tramways (se abrirá en una nueva ventana)This deliverable will contain a collection of use cases to be covered by the envisioned and detailed list of functions and the system requirements of autonomous trams both in depot and in operation
System requirements of ASTP system (se abrirá en una nueva ventana)The deliverable defines the overall system performance requirements of the ASTP system considering the state of the art
Demo specifications (se abrirá en una nueva ventana)Definition of the objectives, test cases/operational use cases and validation criteria for DATO over ERTMS L3 demonstrator
Definitive and aligned requirements set for Onboard Communication Network and Basic Services (se abrirá en una nueva ventana)Requirements including existing ones for OSI layer 1-6 on communication functionality of Onboard Communication Network and Basic Services
High-level consolidation of prior work and agreement on the Modular Platform specification to happen in FP2-R2DATO (se abrirá en una nueva ventana)This deliverable will provide a high-level consolidation of the prior work related to Modular Platforms and will capture the agreements of the partners regarding which aspects related to Modular Platforms will be specified within R2DATO
Testing reports & assessment (WP41) (se abrirá en una nueva ventana)Results of the remote driving of tramways demonstrator
DATO business case outline & required inputs specifications and scheme (se abrirá en una nueva ventana)Requirements (in collaboration with FA1 WP 8/9 and 15/16) for capacity simulation tooling and methodology (like development of Train Path Envelopes for ATO operations) to measure the potential impact of ATO/TMS-C-Das technology
IP assessment and Data Ownership Model (se abrirá en una nueva ventana)Proposal on a model for the data ownership
Publicaciones
Autores:
Iker Millan-Jimenez, Paul Zabalegui, Gorka de Miguel (CEIT)
Publicado en:
Proceedings of the 6th SmartRaCon Scientific Seminar SRC6SS, 2024
Editor:
CEIT
Autores:
Mirzai, Aria; Avula, Ramana Reddy; Damschen, Marvin
Publicado en:
Proceedings of the 6 th SmartRaCon Scientific Seminar (SRC6SS), 2024
Editor:
RISE Research Institutes of Sweden, Safety and Transport, Electrification and Reliability
Autores:
David Kule Mukuhi
Publicado en:
Proceedings of the 6th SmartRaCon Scientific Seminar SRC6SS, 2024
Editor:
CEIT
Autores:
Roger Idrovo, Paul Zabalegui, Alejandro Perez, Jon Bilbao, Sergio Arana, Jaizki Mendizabal; (CEIT)
Publicado en:
Proceedings of the 6th SmartRaCon Scientific Seminar SRC6SS, 2024
Editor:
CEIT
Autores:
Andy Rodríguez Lorenzo, Nerea Fernández-Berrueta, Carlos Pupiales, Alfredo Artiles Vallecillo, Jaizki Mendizabal (CEIT)
Publicado en:
Proceedings of the 6th SmartRaCon Scientific Seminar SRC6SS, 2024
Editor:
CEIT
Autores:
Juliette MARAIS, Quentin Mayolle, Martin Fasquelle,Vincent Tardif, Emilie Chéneau-Grehalle
Publicado en:
Proceedings of the 6th SmartRaCon Scientific Seminar SRC6SS, 2024
Editor:
CEIT
Autores:
Roger Idrovo, Paul Zabalegui, Sergio Arana, Jaizki Mendizabal; (CEIT)
Publicado en:
Proceedings of the 6th SmartRaCon Scientific Seminar SRC6SS, 2024
Editor:
CEIT
Autores:
Lamm, Arne; Parrilla Ayuso, Francisco; Díaz Serrano, Paula
Publicado en:
Proceedings of the 6 th SmartRaCon Scientific Seminar (SRC6SS), 2024
Editor:
CEIT
Autores:
Xavier Morin; Nils O.E. Olsson; Albert Lau
Publicado en:
Procedia Computer Science, 2024, ISSN 1877-0509
Editor:
Elsevier B.V
DOI:
10.1016/J.PROCS.2024.06.339
Autores:
Xavier Morin, Nils O. E. Olsson, Albert Lau
Publicado en:
Future Transportation, Edición 4, 2024, ISSN 2673-7590
Editor:
MDPI AG
DOI:
10.3390/FUTURETRANSP4040065
Buscando datos de OpenAIRE...
Se ha producido un error en la búsqueda de datos de OpenAIRE
No hay resultados disponibles