CORDIS provides links to public deliverables and publications of HORIZON projects.
Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .
Deliverables
This deliverable relates to task 1.3 and is a plan and status report for communication and dissemination. It contains the plan for the next reporting period, and the status of dissemination and communication activities up until M18.
Quality and Risk Management Plan (opens in new window)This deliverable relates to task 1.2 and will provide the detailed procedures that will be used by the Consortium for assuring high quality work and effective risk management. It will provide the foundations for assuring the conformity and the quality of all project deliverables with the respective requirements.
Design Basis (opens in new window)This deliverable relates to task 2.1 and 2.4. and will contain the design parameters and boundary conditions needed for the vessel concept development, and definitions of the additional or updated models for logistics analysis needed to update the existing SO tool.
D&C Plan and Reporting Initial Revision (opens in new window)This deliverable relates to task 1.3 and is a plan and status report for communication and dissemination. It contains the plan for the next reporting period, and the status of dissemination and communication activities up until M6.
Project Management Plan (opens in new window)This deliverable relates to task 1.1 and will provide a Project Management Plan and the procedures that will be used by the Consortium for: 1) coordinating the Consortium members, 2) communicating project results and issues to the EC, and 3) managing financial issues.
This deliverable relates to task 1.5 and is a revised Data Management Plan with status and plan for the next period.The main purpose of the Plan will be defining a) type of Data collected; b) methods and means; c) sharing or classification policies; d) preservation and storage of data even after project timeframe; e) compliance to GDPR.
Data Management Plan Initial Revision (opens in new window)This deliverable relates to task 1.5 and contains the Data Management Plan. It will be established at the beginning of the project and updated at M18 and M36 as separate deliverables. The main purpose of the Plan will be defining a) type of Data collected; b) methods and means; c) sharing or classification policies; d) preservation and storage of data even after project timeframe; e) compliance to GDPR.
This deliverable relates to task 1.3. It is a Project logo, webpage and templates
Publications
Author(s):
Igor Bačkalov, Hans-Christoph Burmeister, Ljubisav Isidorović, Justin Jasa, Marko Josipović, Kristoffer Kloch, Alexandros Koimtzoglou, Vladimir Krasilnikov, Stefan Krause, Denys Mateienko, Håvard Nordahl, Nathalie Reinach
Published in:
Journal of Physics: Conference Series, Issue 2867, 2024, ISSN 1742-6588
Publisher:
IOP Publishing
DOI:
10.1088/1742-6596/2867/1/012018
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available