D&C Plan and Reporting Intermediate Revision
(se abrirá en una nueva ventana)
This deliverable relates to task 1.3 and is a plan and status report for communication and dissemination. It contains the plan for the next reporting period, and the status of dissemination and communication activities up until M18.
Design Impacts
(se abrirá en una nueva ventana)
This deliverable relates to task 4.1. It will contain the impacts of autonomous and ZEM propulsion on inland vessel design. It will answer:How will common naval architecture disciplines be affected by autonomy (hydrodynamics, energy systems, safety, structural design)? How to optimise hull form/structure and propulsion system for autonomous operation? How will weight, space requirement and safety aspects of alternative energy carriers and energy converters change the outcome of holistic design optimisation?
Quality and Risk Management Plan
(se abrirá en una nueva ventana)
This deliverable relates to task 1.2 and will provide the detailed procedures that will be used by the Consortium for assuring high quality work and effective risk management. It will provide the foundations for assuring the conformity and the quality of all project deliverables with the respective requirements.
Design Basis
(se abrirá en una nueva ventana)
This deliverable relates to task 2.1 and 2.4. and will contain the design parameters and boundary conditions needed for the vessel concept development, and definitions of the additional or updated models for logistics analysis needed to update the existing SO tool.
D&C Plan and Reporting Initial Revision
(se abrirá en una nueva ventana)
This deliverable relates to task 1.3 and is a plan and status report for communication and dissemination. It contains the plan for the next reporting period, and the status of dissemination and communication activities up until M6.
Market Analysis
(se abrirá en una nueva ventana)
This deliverable relates to task 2.2 and 2.3 and contains a market analysis, the transport demand, and a definition of the models of the transport demand and existing transport services.
Project Management Plan
(se abrirá en una nueva ventana)
This deliverable relates to task 1.1 and will provide a Project Management Plan and the procedures that will be used by the Consortium for: 1) coordinating the Consortium members, 2) communicating project results and issues to the EC, and 3) managing financial issues.
Uncrewed Vessel Concept
(se abrirá en una nueva ventana)
This deliverable relates to task 4.2. It will contain the vessel conceptualization, and structural analysis.