CORDIS proporciona enlaces a los documentos públicos y las publicaciones de los proyectos de los programas marco HORIZONTE.
Los enlaces a los documentos y las publicaciones de los proyectos del Séptimo Programa Marco, así como los enlaces a algunos tipos de resultados específicos, como conjuntos de datos y «software», se obtienen dinámicamente de OpenAIRE .
Resultado final
First version of the Data Management Plan (DMP). Open sciences and data management plan; Protecting the data while they are being collected, processed, analysed, and backed-up; Ensuring that data obeys with legal regulations, gender and ethical considerations; Regular reporting to the consortium; Monitoring and evaluating database performance; Improving the technology used building new databases.
The report includes the Preliminary definition of the Circularity assessment as a basis for the baseline analyses.
Risk management plan (first version) (se abrirá en una nueva ventana)The first version of the risk management plan contains quality procedures that will be used throughout the project. This plan is based on the preliminary identified risks and is monitored regularly. The plan includes the definition and updating of metrics to assess the quality of the realised solutions, a risk assessment plan to identify potential deviations or setbacks during the project and to prepare recovery actions if necessary.
Scientific and technical management guidelines (se abrirá en una nueva ventana)The report contains guidelines for the scientific and technical monitoring activities and plans to monitor technical achievements, ensure achievement of objectives, work with the coordinator to address objectives, plans, progress, related problems, proposals and recommendations.
Risk management plan (second version) (se abrirá en una nueva ventana)The second version of the risk management. This plan is based on the preliminary identified risks and is monitored regularly. The plan includes the definition and updating of metrics to assess the quality of the realized solutions, a risk assessment plan to identify potential deviations or setbacks during the project and to prepare recovery actions if necessary.
Project identity: brand, marketing basics and website (se abrirá en una nueva ventana)set-up of the project website, logo and marketing material
Harmonized design Inception report: roles mapping, methodological framework and workshop’s dynamics (se abrirá en una nueva ventana)The report includes the DfC methodology with its 4 steps for the applications in the ZEvRA project. It defines the specific working groups and a series of workshops using interactive platforms and different tools and methods, e.g. the Analytic Hierarchy Process (AHP), to define the iteration process between material experts, designers and end users (all participants).
Publicaciones
Autores:
Marco Negozio, Sara di Donato, Riccardo Pelaccia, Adrian H․A․ Lutey, Daniele Carosi, Barbara Reggiani, Alessandro Morri, Lorenzo Donati
Publicado en:
Journal of Materials Science & Technology, Edición 230, 2025, ISSN 1005-0302
Editor:
Elsevier BV
DOI:
10.1016/J.JMST.2025.01.017
Autores:
Felix Digiser, Thomas Vietor
Publicado en:
Procedia CIRP, Edición 136, 2025, ISSN 2212-8271
Editor:
Elsevier BV
DOI:
10.1016/J.PROCIR.2025.08.160
Buscando datos de OpenAIRE...
Se ha producido un error en la búsqueda de datos de OpenAIRE
No hay resultados disponibles