Stakeholder management strategy (First updated version)
(si apre in una nuova finestra)
As part of task 6.2, and related to task 6.1, this deliverable will be the first updated version of the Stakeholder Management Strategy mapping key actors and networks in the demo and potential assicioated regions, assessing their interest, replication and uptake potential, and defining a targeting strategy.
Practices Abstracts: batch 1
(si apre in una nuova finestra)
This deliverables contains 3 practice abstracts
SEACURE co-definition of nutrient related threats. Compilation of the results of the local multi-stakeholders roundtables organised in each basin.
(si apre in una nuova finestra)
This deliverable will include the outcomes of the Task 1.1 and will contain a compilation of proceedings from the local multi-stakeholders’ roundtables that will be organized in each demo site for the co-definition of nutrient related threats, through the participatory exploration of the key drivers, pressures and impacts in each case study area.
Dissemination and communication plan (first updated version). Activities outlined in the strategic D&C plan focused to their specific scope (Regional, Ars and EU)
(si apre in una nuova finestra)
An updated version of the project D&C Strategy and Plan will be delivered after an internal performance evaluation will be conducted, with the objective to assess relevance, coherence and impact of the dissemination activities implemented. D6.2 will also include a report about the executed cooperation activities planned in Task 6.3.
Dissemination and communication plan (first version). Activities outlined in the strategic D&C plan focused to their specific scope (Regional, Ars and EU)
(si apre in una nuova finestra)
As part of task 6.1, MedWaves will draft the project Dissemination and Communication (D&C) Strategy and Plan, including, general and specific dissemination objectives, audience composition and development actions, communication channels analysis and indicators, monitoring activities, brand guidelines, and standard communication procedures.
Stakeholder management strategy (First version)
(si apre in una nuova finestra)
As part of task 6.2, and related to task 6.1, the first version of a Stakeholder Management Strategy will be delivered by MedWaves, mapping key actors and networks in the demo and potential assicioated regions, assessing their interest, replication and uptake potential, and defining a targeting strategy.
Regional Stocktaking Analysis. Integrated results of the stocktaking exercises past implemented solution.
(si apre in una nuova finestra)
This deliverable will be a report integrating the results of the stocktaking exercises (consisting of desk research and surveys) of task 1.3 analysing past implemented solutions for nutrient excess prevention, reduction and mitigation.
Po di Volano system design
(si apre in una nuova finestra)
This deliverable will include the outcome of the Task 2.2 including: 1) the description of all the technical characteristics of the NBS, i.e. the assessment of the hydraulic functionality of the basin and all the technical details of the new canal project; 2) the ecological design of the NBS, aimed at optimising the development of the emerging aquatic vegetation and its maintenance. It will also include the evaluation of the Emilia-Romagna Po Delta Park and the Superintendency of Archaeological Heritage, as the site is located in a pre-park area of archaeological interest.
Comprehensive Action-oriented Vision Papers (first version). Compilation of suggest adequate regional goals and possible action avenues for each basin region
(si apre in una nuova finestra)
This deliverable will include the outcomes of the Task 1.4 and will contain the initial compilation of regional goals and possible action avenues for each demo region. The initial Vision Papers will reflect the regional vision of stakeholders in relation to their needs and expectations, for the co-definition of the territorial context in which the project innovations will be deployed.
Thessaly Plain: Final System Design. Finalize design taking into consideration the initial experimental results obtained at laboratory pilot-tests.
(si apre in una nuova finestra)
This deliverable will include the description of the finalized combined UNSAT/SAT-CW and algal pond system design that will be tested in the demonstration activities described in Subtask 2.4.1. This report will include the results of the initial experimental results obtained at laboratory pilot-tests carried out to provide evidences finalize the system design finalization.
Strategic Orientation Analyses. Integrated result of the quantified SWOT analyses of the regional innovation ecosystems within the basins/territorial units.
(si apre in una nuova finestra)
This deliverable will include the results of Task 1.2. Based on desk research, the deliverable will integrate a thorough analysis of Strengths, Weaknesses, Opportunities, and Threats of the regional innovation ecosystems within the basins/territorial units. The work will be coordinated by CWP with contributions from each of the demo regions. The collected information will complement the results of Task 1.1 and will prepare the ground to foster the uptake of results and develop the Regional Upscaling Plans.