Project Results
CORDIS provides links to public deliverables and publications of HORIZON projects.
Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .
Deliverables
1) Identification of JOULIA stakeholders/profiling; 2) dissemination methods, channels, associated activities and tools; 3) dissemination procedures; 4) D&C activities’ schedule and complementarities among partners. Up to 3 updates depending on required changes throughout project.
Dissemination, Exploitation & Comunication Plan (update M18) (opens in new window)Report on the progress of the D&C planning and activities during the project (M18).
Report on stakeholders needs (opens in new window)Stakeholders’ interviews and evaluation of the results for the future upscaling of the developed technologies.
Predictive maintenance platform (opens in new window)Report on the design, and development of a predictive maintenance tool, offering warnings of any irregular range of values for key selected parameters (e.g. temperature, heat flux) or risks to the relevant operators of the plants on the proposed heating systems. Alpha version in M18, final version in M36. Tool validity verification through the demonstration campaigns, particularly during Task 10.3 and Task 11.3.
Health and safety requirements - Preliminary report (opens in new window)Assessments of identified hazards and risks according to the European standards and legislation. A first version will be released in M12 and then updated in M18 to allow the following of the conceptual and final design of solutions
Evaluation methodology (opens in new window)Report on the definition of the appropriate KPIs for evaluating technical, environmental, economic, and social aspects. Guidelines to facilitate KPI monitoring and measuring on the basis of a common evaluation methodology.
RRI First report and Progress Report (opens in new window)It will report the progress of the implementation of the RRI actions in the project. It will count with two versions.
Project synergies report (opens in new window)Report with the results obtained from the collaboration and synergies with other EU funded projects and platforms.
Characterization of demo sites (opens in new window)Report on the characterization of the processes to be addressed during JOULIA demonstration phase.
Project Progress Report (opens in new window)This deliverable will contain the overall status of the project. It will count with three versions.
Health and safety requirements (update M18) (opens in new window)Assessment of hazards and risks identified in accordance with European standards and legislation (Task 4.3). This will be an updated version of D4.3, to be submitted in M18, to follow the conceptual and final design of the solutions. (T4.3)
Dissemination and Communication report (opens in new window)Report on the progress of the DEC activities during the project (M24) and final report (M48)
Skills Needs Assessment Report (opens in new window)ISQ will work with all partners in the skills gap identification, based in the comparative analysis between the existing professional competences and technologies, and the new professional profiles/competences required to be integrated and operated with the electrification of the industrial processes, resulting in a summary report with the Skills Gap Identification
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available