PRessurIzed PEM electrOLYZER

Objective

The primary objective of the PrimoLyser project is to develop, construct, and test a cost-minimised highly efficient and durable PEM-electrolyser stack aimed for integrated with domestic µCHPs through a combination of the following activities:
1) Specification done by the end-user(s);
2) Basic material R&D on catalyst & membrane to increase durability & efficiency while reducing cost;
3) Process development to fabricate high performance MEAs;
4) Engineering of a durable, reliable, and robust high pressure PEM stack through CFD modelling and design optimisation;
5) Continuous test for 2,000 hours together with a 1.5 kW µCHP; and
6) An evaluation headed by the end-user(s)

The key-targets for the stack are as follows:
A) Hydrogen production capacity: 1 Nm3/h;
B) Pressure: 10 MPa (100 bar);
C) 1.68 V @ 1.2 A/cm2 not only at BoL but also after 2,000 hours of continuous operation;
D) Cost: <5,000 € per Nm3 H2 production capacity per hour in series production; and
E) Durability: >20,000 hours @ constant load

Furthermore, the stack will be liquid cooled to enhance durability and enable easy heat utilisation. This is important as a PEM electrolyser operated with renewable will run when the electricity is cheap and therefore not simultaneous with the µCHP.
The PrimoLyser project is scheduled for 2.5 years. The present proposal is phase I in a 2 step development, where phase II will comprise BoP development & full integration of the electrolyser with a µCHP followed by a field test.
The Consortium is well balanced, with the following 6 partners complementing one another to achieve the project target goals: i) A PEM FC manufacturing company (IRD Fuel Cells A/S [SME], DK); ii) 3 research centres and universities VTT (FI), Åbo Akademi (FI) & ECN (NL); iii) A leading manufacturer of ion exchange polymers and membranes (Fumatech (DE)); and iv) A subsidiary utility company (Abengoa-Hynergreen [ES])

Call for proposal

FCH-JU-2008-1
See other projects for this call

Coordinator

IRD FUEL CELLS A/S
EU contribution
€ 449 130,00
Address
EMIL NECKELMANNS VEJ 15A
5220 Fraugde
Denmark

See on map

Region
Danmark Syddanmark Fyn
Activity type
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Administrative Contact
Laila Grahl-Maden (Dr.)
Links
Total cost
No data

Participants (5)