Skip to main content
European Commission logo
English English
CORDIS - EU research results
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary

Rethinking Container Management Systems

Objective

Container terminals serve thousands of ships, store billions of TEUs, compete to serve the next vessel, and introduction of larger ships will result in new challenges. While advances have been made in terminal automation (Automated Ground Vehicle (AGV), gate control, yard cranes, etc.), with current technologies terminals are limited by their ability to maintain growth and quality of service. To address these trends and demands the Robotic Container Management System (RCMS) has been developed. As a contribution to its implementation, Project main objectives are:
A. to develop a detailed simulation model for RCMS to be evaluated in 2 Terminals (Gdansk and Koper) plus a set of generic simulation tools to be used in all terminals;
B. to assess and compare RCMS performance with other state-of-the-art container handling technologies for 2 Terminals (Gdansk and Koper) with different features;
C. to assess and compare RCMS performance with other state-of-the-art container handling technologies for 2 ports (Gdansk and Koper), with focus on comparison between RCMS solution and port surface extension;
D. to assess impact of RCMS in a simulated transport network in terms of efficiency, reliability, capacity, performance indicators (travel times, average speed, etc.) and impacts (noise and air pollution) in the Port of La Spezia.
Main results will be: a well-defined RCMS control logic; a dynamic physical AGV model to test AGV behavior; definition of operational procedures for RCMS; a generic simulation tool enabling testing of RCMS for various sites by non-simulation experts; an efficient entire terminal design with RCMS; a set of validated and quantified benefits of RCMS compared to commonly used handling systems; a set of Key Performances Indicators of the transport network using RCMS. Consortium is made by leading industries, SMEs, Research/Academic Centers and 3 ports/terminals as End-users. Project duration is 21 months and estimated eligible costs are 4 million €

Call for proposal

H2020-MG-2014-2015

See other projects for this call

Sub call

H2020-MG-2014_TwoStages

Coordinator

CIRCLE SPA
Net EU contribution
€ 431 073,88
Address
VIA G. BATTISTA PERGOLESI 26
20124 Milano
Italy

See on map

SME

The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.

Yes
Region
Nord-Ovest Lombardia Milano
Activity type
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Links
Total cost
€ 431 073,88

Participants (9)