European Commission logo
italiano italiano
CORDIS - Risultati della ricerca dell’UE
CORDIS

SELF-BOUYANT PRECAST CONCRETE FOUNDATION FOR THE CRANELESS INSTALLATION OF COMPLETE OFFSHORE WIND TURBINES: FULL SCALE OFFSHORE PROTOTYPE

Obiettivo

The offshore wind market is a young and rapidly growing market, whose current project pipeline for 2025/30 would equal nearly 80 nuclear plants, mostly in Europe. The next decade and beyond may average 1,000 offshore towers/year worldwide, with an overall investment volume around 15-20.000 M€/year.

This growing sector faces technological challenges, as it is set to move into deeper waters further offshore while being able to reduce the costs in order to reach a competitive LCOE (levelised cost of energy). For water depths above 40m (70% of the future market) approximately 40-50% of investment corresponds to the substructure (foundation and tower). Therefore a significant cost reduction in foundation/tower would drastically improve the overall cost of offshore wind energy.

This project intends to develop and demonstrate in operative environment a full scale prototype of a revolutionary substructure system for offshore wind turbines. The concept consists in a self-installing precast concrete telescopic tower which for the first time ever shall allow for crane-free offshore installation of foundations, towers and turbines, thus overcoming the constraints imposed by the dependence on offshore heavy-lift vessels. It will allow for a full in-shore preassembly of the complete system, which is key to generate a highly industrialized manufacturing process with high production rates and optimized risk control. The main benefits expected are:
• 30-40% cost reduction (both CAPEX and OPEX).
• Large water depth applicability range for deep offshore (>45m water depth).
• Supports increased turbine size (5-8MW).
• Allows for large scale fast industrial deployment of foundations.
• Reduces dependence on costly and scarce installation vessels.
• Improved asset integrity (durability)

This solution will imply a radical step forward for cost-effective and industrially deployable deep offshore wind.

Invito a presentare proposte

H2020-SMEInst-2014-2015

Vedi altri progetti per questo bando

Bando secondario

H2020-SMEINST-2-2014

Meccanismo di finanziamento

SME-2 - SME instrument phase 2

Coordinatore

ESTEYCO SA
Contribution nette de l'UE
€ 2 497 862,50
Indirizzo
CALLE MENENDEZ PIDAL 17
28036 Madrid
Spagna

Mostra sulla mappa

PMI

L’organizzazione si è definita una PMI (piccola e media impresa) al momento della firma dell’accordo di sovvenzione.

Regione
Comunidad de Madrid Comunidad de Madrid Madrid
Tipo di attività
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Collegamenti
Costo totale
€ 3 575 441,46