Skip to main content
Vai all'homepage della Commissione europea (si apre in una nuova finestra)
italiano it
CORDIS - Risultati della ricerca dell’UE
CORDIS

PROFITABLE LOW HEAD HYROPOWER

Periodic Reporting for period 3 - Hydrolowhead (PROFITABLE LOW HEAD HYROPOWER)

Periodo di rendicontazione: 2017-03-01 al 2017-10-31

Number of SHP plant, their installed capacity and electricity generation between 2000 and 2020.
Prototype built of Microturbine
Design of Isometric View Turbine 45 kW
Il mio fascicolo 0 0