Objetivo
The objective of AMICE III/P is to demonstrate the value to business of CIM-OSA through pre-pilot implementations of enterprise model engineering and model-based manufacturing operation control and monitoring. The work is based on the first release of CIM-OSA specifications developed during the previous AMICE projects (688, 2422, 5288) and made public in 1992.
The project aims to:
- demonstrate CIM-OSA enterprise model engineering, including model optimisation through simulation, and to show the business advantages of CIM-OSA modelling compared to other modelling methods
- demonstrate CIM-OSA enterprise model execution for operation control and monitoring through the implementation of the CIM-OSA integrating infrastructure
- demonstrate CIM-OSA's ability to co-exist with inherited systems during operation control and monitoring
- consolidate the CIM-OSA specification and publish a new technical baseline.
Tema(s)
Data not availableConvocatoria de propuestas
Data not availableRégimen de financiación
Data not availableCoordinador
1831 DIEGEM
Bélgica
Ver en el mapa
Participantes (14)
75781 Paris
Ver en el mapa
CH4 0DR Chester
Ver en el mapa
92039 Paris la Défense
Ver en el mapa
10125 Torino
Ver en el mapa
38090 Villefontaine
Ver en el mapa
70569 Stuttgart
Ver en el mapa
54602 Villers-les-Nancy
Ver en el mapa
9000 St. Gallen
Ver en el mapa
00198 Roma
Ver en el mapa
1056 BM AMSTERDAM
Ver en el mapa
52074 Aachen
Ver en el mapa
81739 München
Ver en el mapa
47011 VALLADOLID
Ver en el mapa
33405 Talence
Ver en el mapa