Objectif
The objective of AMICE III/P is to demonstrate the value to business of CIM-OSA through pre-pilot implementations of enterprise model engineering and model-based manufacturing operation control and monitoring. The work is based on the first release of CIM-OSA specifications developed during the previous AMICE projects (688, 2422, 5288) and made public in 1992.
The project aims to:
- demonstrate CIM-OSA enterprise model engineering, including model optimisation through simulation, and to show the business advantages of CIM-OSA modelling compared to other modelling methods
- demonstrate CIM-OSA enterprise model execution for operation control and monitoring through the implementation of the CIM-OSA integrating infrastructure
- demonstrate CIM-OSA's ability to co-exist with inherited systems during operation control and monitoring
- consolidate the CIM-OSA specification and publish a new technical baseline.
Thème(s)
Data not availableAppel à propositions
Data not availableRégime de financement
Data not availableCoordinateur
1831 DIEGEM
Belgique
Voir sur la carte
Participants (14)
75781 Paris
Voir sur la carte
CH4 0DR Chester
Voir sur la carte
92039 Paris la Défense
Voir sur la carte
10125 Torino
Voir sur la carte
38090 Villefontaine
Voir sur la carte
70569 Stuttgart
Voir sur la carte
54602 Villers-les-Nancy
Voir sur la carte
9000 St. Gallen
Voir sur la carte
00198 Roma
Voir sur la carte
1056 BM AMSTERDAM
Voir sur la carte
52074 Aachen
Voir sur la carte
81739 München
Voir sur la carte
47011 VALLADOLID
Voir sur la carte
33405 Talence
Voir sur la carte