Skip to main content
Aller à la page d’accueil de la Commission européenne (s’ouvre dans une nouvelle fenêtre)
français fr
CORDIS - Résultats de la recherche de l’UE
CORDIS

Low Cost Onshore Power Supply (LoCOPS)

Objectif

The main objective of this project is to supply and demonstrate a competitive shore power supply also called Onshore Power
Supply (OPS) related to providing electricity for cruise ships when docked in port. OPS installations saves consumption of
fuel and eliminates the air pollution associated with the use of fuel. Many European cities are planning urban growth in areas
near ports and are frequently discussing ways of encouraging ships to use OPS to meet clean air objectives.
Electricity supply in Europe has a frequency of 50 Hz but most cruise ships and other large vessels are designed for 60Hz.
Thus, in European ports electricity has to be converted to 60 Hz by a quayside electricity converter. The cost of frequency
converter grows proportionally with power consumption and thus for cruise ships holds a considerable part of the OPS
investment. So far, ports in Europe have been restraint from investing in OPS installations of this type and size due to very
high equipment cost.
The high equipment cost is seen as a consequence of a new market with very limited capable suppliers causing a high
bargaining power in the favor of the selling part. Comparable trends were seen within the Wind power segment in the past
but the wind turbines everlasting competition towards fossil fuels has kept focus on lowering cost of all parts of the turbines
with great success.
PowerCon has for the last 5-6 years been a part of this success by adding significant savings into the industry with beyond
state of the art converter solutions at low cost. These solutions are in many aspects identical with the required for OPS,
making it obviously to offer the same savings into the maritime sector, ensuring a reasonable return of investment for the
ports and for the benefit of the environment.
The ambition of this project is to offer the ports the first time competitive OPS solution when comparing price on shore side
electricity with the alternative from the ships auxiliary engines.

Programme(s)

Thème(s)

Régime de financement

SME-1 - SME instrument phase 1

Voir tous les projets financés dans le cadre de ce programme de financement

Appel à propositions

(s’ouvre dans une nouvelle fenêtre) H2020-SMEInst-2014-2015

Voir tous les projets financés au titre de cet appel

Coordinateur

POWERCON AS
Contribution nette de l'UE
€ 50 000,00
Adresse
FABRIKSVEJ 6 PORT 9
9560 Hadsund
Danemark
PME
Oui
Région
Danmark Nordjylland Nordjylland
Type d’activité
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Liens
Coût total
€ 71 429,00