Objetivo By injecting coal/water sludge into the blast furnace, it should be possible to achieve high productivity and uniform blast-furnace working. The coal/water mixtures will be made in a 15 t/h plant which is to be commissioned at the beginning of 1986. It is intended to determine the influence of hydrogen and the coke replacement ratio. In addition, productivity, regularity of the blast-furnace operation, fuel consumption and pig-iron quality are to be ascertained. The studies will be carried out in ITALSIDER's No 3 blast furnace in Taranto. Programa(s) ECSC-STEELRES 7C - Medium-term guidelines (ECSC) "technical steel research", 1986-1990 Tema(s) B - Reduction of iron ores Convocatoria de propuestas Data not available Régimen de financiación CSC - Cost-sharing contracts Coordinador CENTRO SVILUPPO MATERIALI SPA Aportación de la UE Sin datos Dirección Via di Castel Romano 100/102 00128 ROMA EUR Italia Ver en el mapa Coste total Sin datos Participantes (1) Ordenar alfabéticamente Ordenar por aportación de la UE Ampliar todo Contraer todo ITALSIDER Italia Aportación de la UE Sin datos Dirección Viale Corsica, 4 16128 GENOVA Ver en el mapa Coste total Sin datos