Skip to main content
European Commission logo print header
Contenuto archiviato il 2022-11-21

The influence of injection of coal/water sludge on the blast furnace process

Obiettivo

By injecting coal/water sludge into the blast furnace, it should be possible to achieve high productivity and uniform blast-furnace working. The coal/water mixtures will be made in a 15 t/h plant which is to be commissioned at the beginning of 1986. It is intended to determine the influence of hydrogen and the coke replacement ratio. In addition, productivity, regularity of the blast-furnace operation, fuel consumption and pig-iron quality are to be ascertained. The studies will be carried out in ITALSIDER's No 3 blast furnace in Taranto.

Invito a presentare proposte

Data not available

Meccanismo di finanziamento

CSC - Cost-sharing contracts

Coordinatore

CENTRO SVILUPPO MATERIALI SPA
Contributo UE
Nessun dato
Indirizzo
Via di Castel Romano 100/102
00128 ROMA EUR
Italia

Mostra sulla mappa

Costo totale
Nessun dato

Partecipanti (1)