Reports on investment contracts signed
(si apre in una nuova finestra)
The first two pools of buildings and street lighting systems will have investment contracts signed by month 38 the second two pools of buildings and street lighting systems by month 40 and the for the third two pools by month 43
Training module on technical aspects
(si apre in una nuova finestra)
Training module on technical aspects of energy efficient improvements in buildings and in street lighting
Final publishable report
(si apre in una nuova finestra)
Final publications will include important lessons learnt recommendations guidance for replicators and detailed information on the projects process as well as signed contracts and contractual arrangements
Third pools with building and street lighting projects
(si apre in una nuova finestra)
Third pool with building and street lighting projects
First pools with building and street lighting projects
(si apre in una nuova finestra)
Second pools with building and street lighting projects
(si apre in una nuova finestra)
Rhodoshop Business Plan
(si apre in una nuova finestra)
Business plan on how to make the Rhodoshop activities commercially successful and selfsupporting
Rhodoshop guidance material
(si apre in una nuova finestra)
Guidance with conclusions on why concrete investment projects succeeded or failed in the contexts of local circumstances in Rhodope Region and with recommendations on how to improve the available locally business models andor introduce new ones that are likely to produce better results
Training module on economic aspects
(si apre in una nuova finestra)
Training module on economic aspects of energy efficient improvements in buildings and in street lighting
Dissemination and exploitation strategy
(si apre in una nuova finestra)
The overall Rhodoshope strategy for dissemination and exploration of results, including the goals, target audience, media to be used, and timing.
Rhodoshop Examples Catalogue
(si apre in una nuova finestra)
Catalogue with examples and different categories of reasons regarding successfailure of investment projects together with conclusions on why investment failed eg not suitable for pooling or lack of suitable financier
Inventory of buildings and street lighting systems
(si apre in una nuova finestra)
Inventory of building and street lighting systems to be considered for inclusion in the Rhodoshop project pipe-line.
Training module on Green Public Procurement
(si apre in una nuova finestra)
Training module on priciples and specifics of Green Public Procurement.
Pipe-lines with the projects selected for investment
(si apre in una nuova finestra)
Pipelines with the projects selected for investment including technical and economic parameters of each project and its envisaged financial plan and financier institutionsThe first two pipelines of buildings and street lighting systems will be done by month 17 for the second two pipelines of buildings and street lighting systems by month 19 and the for the third two pools by month 22
Rhodoshop Summary of Results
(si apre in una nuova finestra)
Rhodoshop summary of results on investment projects successfully launched and on failed invetsmnet projects
Summary of the investments and energy related impact indicators including proof of investments
(si apre in una nuova finestra)
Summary of the launched investments and energy related impact indicators including proof of investments
Mission report on study tour to GRE-Liege
(si apre in una nuova finestra)
Mission report on the envisaged study tour to GRE-Liege for utake their experience in RENOWATT One-stop-shop establishmmnet and operation.