Skip to main content
European Commission logo
Deutsch Deutsch
CORDIS - Forschungsergebnisse der EU
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary

Pushing forward irradiation monitoring efficiency in the PV industry

Ziel

As the photovoltaics (PV) industry has exponentially grown towards large scale installation over the last years, the need for accurately monitoring the solar resource of PV power plants has increased. Historically, the PV industry has relied on monitoring stations for irradiance measurements, i.e. bulky and expensive equipment featuring pyranometers, pyrheliometes and sun trackers. However, because of their severe economic and operational limits, this solution does not allows for fine grained detection and intelligence of system failures causing losses of production, and thus of revenue, and low efficiency of maintenance operations.
Our project aims at bringing to the market an innovative smart and handy environmental sensor featuring innovations in terms of technology, capabilities and cost that significantly exceed limits and downsides of irradiation assessment tools commercially available. By enabling a simple and efficient single-tool monitoring it empowers plant managers for precise and accurate characterization of the PV performance, that directly translates into room for optimizing profitability.
Two major European companies have expressed a strong interested in the our sensor and are willing to run pilot tests in their PV installations: one is LightSource, the leading developer of solar PV projects with 30% market share in the large scale solar sector in UK; the other is Enel Green Power, the Italian-based multinational developer and manager of 1.6 GW of large-scale solar plant across Europe, Africa and Americas. These two giants cumulatively manage 1.1% of total solar capacity installed worldwide.

Aufforderung zur Vorschlagseinreichung

H2020-SMEInst-2016-2017

Andere Projekte für diesen Aufruf anzeigen

Unterauftrag

H2020-SMEINST-2-2016-2017

Koordinator

ALITEC SRL
Netto-EU-Beitrag
€ 669 761,75
Adresse
VIA PONTE NAZIONALE 33
54023 FILATTIERA
Italien

Auf der Karte ansehen

KMU

Die Organisation definierte sich zum Zeitpunkt der Unterzeichnung der Finanzhilfevereinbarung selbst als KMU (Kleine und mittlere Unternehmen).

Ja
Region
Centro (IT) Toscana Massa-Carrara
Aktivitätstyp
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Links
Gesamtkosten
€ 956 802,50