Making hydrogen affordable to sustainably operate Everywhere in European cities

Resultado final

EVERYWH2ERE Demonstration tracking tool and KPIs Panel

Realization of an Excel Sheet to be accessible to all the partners to monitor where the gensets will be installed and their performances in terms of KPIs (both KPIs of the project to evaluate the achievement of objectives and KPIs to evaluate genset general impact). This tracking took will be constantly updated during the project lifetime and included as annex of D1.6, D2.2, D8.3, D4.4, D4.5, D4.6, D4.7, D4.8, D4.9, D8.4. This tool has the objective of tracking the status of the installation and deployment of the genset and it will work as a mean of verification and reporting of the achievement of the project KPIs.

Optimized design of an ejector to be integrated in the 25 kW EVERYWH2ERE genset

Considering a dedicated modelling and test campaign design of an ejector to be integrated in the 25 kW EVERYWH2ERE genset

Dissemination and Communication Plan

Definition of a dissemination and communication plan for the suitable promotion of the project: identification of agreed dissemination measures/procedures/channels, dissemination events, stakeholders engagement and events

First Stakeholders' and cities vision document

Report on the preliminary city and industrial stakeholders group activities intervies and events

Test site description and requirements for EVERYWH2ERE gensets specification

Description of the identified type of demosites and what are their requirements in terms of technical (energy demand profile) and non-technical (hazardous aspects/installation permitting) requirements towards the most proper genset specification

Identification of current business models, permitting and operating parameters of temporary gensets towards future marketability of EVERYWH2ERE Solutions

Preliminary assessment of the replication criteria of the EVERYWH2ERE gensets considering current business models permitting and operating parameters load profile operating hours etc of SotA gensets ICEs battery UPS etc

Final Report on deployment and demonstration activities during music festivals

Final Report of demonstration activities at music festival: highlighting critical issues, KPIs, installation and O&M aspects. Formal update of demonstration tracking tool and KPIs Panel

First Report on deployment and demonstration activities at construction sites

First Report of demonstration activities at construction sites: highlighting critical issues, KPIs, installation and O&M aspects. Formal update of demonstration tracking tool and KPIs Panel

EVERYWH2ERE Leaflet and Poster

Realization of Dissemination material for the promotion of the project and reflecting project visual image

Market and Stakeholders Analysis questionnaire and interview plan

Redaction of a questionnaire to be circulated among EVEVRYWH2ERE Industrialcity stakeholders for market and stakeholders interest assessment Preliminary calendar of Stakeholders group activities and interviews

City policies and regulatory framework for the support of the spreading of EVERYWH2ERE FC gensets

Considering EVERYWH2ERE city group inputs, guidelines and recommendation for policy redaction and city construction works and temporary events permitting issues adjustments towards EVERYWH2ERE gensets’ spreading

Report on EVERYWH2ERE flexibility performance enhancement and impact on components life and CAPEX

Assessment of the most relevant technological modification/improvement at stack, Fuel cell system, control, storage level to be studied and demonstrated in the EVERYWH2ERE project to enlarge FC system lifetime and reduce CAPEX

Life cycle assessment (LCA) of the FC gensets in construction sites and temporary venues

LCA report presenting the inventory and impact assessment results obtained of the FC systems and the relevant references also considering demonstration outcomes in the EVERYWH2ERE Demos.

Final Stakeholders' and cities vision document

Considering all the stakeholders’ group activities, recommendation and policy for FC genset promotion at city and industrial level

LCC and logistic analysis of the use of the EVERYWH2ERE gensets in different EU countries

Considering D5.2, assessment of costs and logistic aspects of the use of the EVERYWH2ERE gensets and hydrogen supply in a LCC approach

Mapping the hydrogen supply point in EU countries

Analysis and localization of hydrogen supply point (industrial premises, hydrogen refuelling station, industrial gas commercial retailers and distributors) all around Europe

First Report on deployment and demonstration activities during temporary events

First Report of demonstration activities at temporary events: highlighting critical issues, KPIs, installation and O&M aspects. Formal update of demonstration tracking tool and KPIs Panel

Test sites data collections and consolidation for benchmarking with temporary generators technologies

Report on the demonstration data collection with a focus on KPIs and benchmark with other gensets’ technologies

First Report on deployment and demonstration activities during music festivals

First Report of demonstration activities at music festival: highlighting critical issues, KPIs, installation and O&M aspects. Formal update of demonstration tracking tool and KPIs Panel

Interim Report on dissemination and communication activities - Dissemination Committee report

Interim Report on dissemination and communication activities along the project, statistics about number of stakeholders intercepted towards the evaluation of the effectiveness of the actions

Preliminary screening of the environmental impacts of the FC gensets

Preliminary LCA and emission report presenting the inventory and impact assessment results obtained of the FC systems and the relevant references also benchmarking with other gensets

First Report on dissemination and communication activities - dissemination Committee report

First Report on dissemination and communication activities along the project statistics about number of stakeholders intercepted towards the evaluation of the effectiveness of the actions

Best practices and measures for the installation of the FC gensets in demonstrator venues for future replication

Considering construction sites and temporary events permitting aspects definition of the guidelines for future installation of the gensets and how permitting issues could be properly modifiedintegrated to welcome EVERYWH2ERE gensets

Final Report on deployment and demonstration activities at construction sites

Final Report of demonstration activities at construction sites: highlighting critical issues, KPIs, installation and O&M aspects. Formal update of demonstration tracking tool and KPIs Panel

Final Report on dissemination and communication activities - Dissemination Committee report

Final Report on dissemination and communication activities along the project, statistics about number of stakeholders intercepted towards the evaluation of the effectiveness of the actions

EVERYWH2ERE Gensets Enabling technologies (FC and H2 Storage) Assessment Report

Technological and Commercial Assessment of the State of the Art FC and hydrogen storage technologies towards the identification of the most suitable ones for gensets realization

Temporary Events and Music Festivals demonstration calendar

Following the dissemination plan, presentation of a preliminary calendar of the identified festival and events where to test the gensets. Description of the test cases and identification of potential critical point for the demonstration

Final Report on deployment and demonstration activities during temporary events

Final Report of demonstration activities at temporary events: highlighting critical issues, KPIs, installation and O&M aspects. Formal update of demonstration tracking tool and KPIs Panel

Market and Stakeholders Analysis

Commercial assessment considering both potential components supplier and end-users’

100 kW EVERYWH2ERE genset prototype: installation and O&M guidelines

Final protoype of the 100 kW EVERYWH2ERE genset and guidelines for its operation and maintenance (starting from D4.1)

25 kW EVERYWH2ERE genset prototype: installation and O&M guidelines

Final protoype of the 25 kW EVERYWH2ERE genset and guidelines for its operation and maintenance (starting from D4.1)

H2 Corner Setup
Logistic and Environmental decision support tool for future replication

Starting from D5.3 outcomes, realization of a geo-referred tool able to calculate logistic costs and environmental impact considering gensets installation location and gas supply points location.

E-handbook on guidelines for EVERYWH2ERE replication across Europe covering technical, economic, legislative, social and environmental aspects

Starting from prototype specification, demonstration (D4.7) and stakeholders’ activities outcomes and D6.6, D5.5; redaction of a PDF handbook for the promotion of project outcomes

Data Management Plan

Definition of project research data to be provided to Open Access

Public Website and Social Media profile Setup

Realization of a project website and activation of social media profile on Twitter and Linkedin