Risultati finali
Realization of an Excel Sheet to be accessible to all the partners to monitor where the gensets will be installed and their performances in terms of KPIs (both KPIs of the project to evaluate the achievement of objectives and KPIs to evaluate genset general impact). This tracking took will be constantly updated during the project lifetime and included as annex of D1.6, D2.2, D8.3, D4.4, D4.5, D4.6, D4.7, D4.8, D4.9, D8.4. This tool has the objective of tracking the status of the installation and deployment of the genset and it will work as a mean of verification and reporting of the achievement of the project KPIs.
Optimized design of an ejector to be integrated in the 25 kW EVERYWH2ERE gensetConsidering a dedicated modelling and test campaign design of an ejector to be integrated in the 25 kW EVERYWH2ERE genset
Dissemination and Communication PlanDefinition of a dissemination and communication plan for the suitable promotion of the project: identification of agreed dissemination measures/procedures/channels, dissemination events, stakeholders engagement and events
First Stakeholders' and cities vision documentReport on the preliminary city and industrial stakeholders group activities intervies and events
Test site description and requirements for EVERYWH2ERE gensets specificationDescription of the identified type of demosites and what are their requirements in terms of technical (energy demand profile) and non-technical (hazardous aspects/installation permitting) requirements towards the most proper genset specification
Identification of current business models, permitting and operating parameters of temporary gensets towards future marketability of EVERYWH2ERE SolutionsPreliminary assessment of the replication criteria of the EVERYWH2ERE gensets considering current business models permitting and operating parameters load profile operating hours etc of SotA gensets ICEs battery UPS etc
Final Report on deployment and demonstration activities during music festivalsFinal Report of demonstration activities at music festival: highlighting critical issues, KPIs, installation and O&M aspects. Formal update of demonstration tracking tool and KPIs Panel
First Report on deployment and demonstration activities at construction sitesFirst Report of demonstration activities at construction sites: highlighting critical issues, KPIs, installation and O&M aspects. Formal update of demonstration tracking tool and KPIs Panel
EVERYWH2ERE Leaflet and PosterRealization of Dissemination material for the promotion of the project and reflecting project visual image
Market and Stakeholders Analysis questionnaire and interview planRedaction of a questionnaire to be circulated among EVEVRYWH2ERE Industrialcity stakeholders for market and stakeholders interest assessment Preliminary calendar of Stakeholders group activities and interviews
City policies and regulatory framework for the support of the spreading of EVERYWH2ERE FC gensetsConsidering EVERYWH2ERE city group inputs, guidelines and recommendation for policy redaction and city construction works and temporary events permitting issues adjustments towards EVERYWH2ERE gensets’ spreading
Report on EVERYWH2ERE flexibility performance enhancement and impact on components life and CAPEXAssessment of the most relevant technological modification/improvement at stack, Fuel cell system, control, storage level to be studied and demonstrated in the EVERYWH2ERE project to enlarge FC system lifetime and reduce CAPEX
Life cycle assessment (LCA) of the FC gensets in construction sites and temporary venuesLCA report presenting the inventory and impact assessment results obtained of the FC systems and the relevant references also considering demonstration outcomes in the EVERYWH2ERE Demos.
Final Stakeholders' and cities vision documentConsidering all the stakeholders’ group activities, recommendation and policy for FC genset promotion at city and industrial level
LCC and logistic analysis of the use of the EVERYWH2ERE gensets in different EU countriesConsidering D5.2, assessment of costs and logistic aspects of the use of the EVERYWH2ERE gensets and hydrogen supply in a LCC approach
Mapping the hydrogen supply point in EU countriesAnalysis and localization of hydrogen supply point (industrial premises, hydrogen refuelling station, industrial gas commercial retailers and distributors) all around Europe
First Report on deployment and demonstration activities during temporary eventsFirst Report of demonstration activities at temporary events: highlighting critical issues, KPIs, installation and O&M aspects. Formal update of demonstration tracking tool and KPIs Panel
Test sites data collections and consolidation for benchmarking with temporary generators technologiesReport on the demonstration data collection with a focus on KPIs and benchmark with other gensets’ technologies
First Report on deployment and demonstration activities during music festivalsFirst Report of demonstration activities at music festival: highlighting critical issues, KPIs, installation and O&M aspects. Formal update of demonstration tracking tool and KPIs Panel
Interim Report on dissemination and communication activities - Dissemination Committee reportInterim Report on dissemination and communication activities along the project, statistics about number of stakeholders intercepted towards the evaluation of the effectiveness of the actions
Preliminary screening of the environmental impacts of the FC gensetsPreliminary LCA and emission report presenting the inventory and impact assessment results obtained of the FC systems and the relevant references also benchmarking with other gensets
First Report on dissemination and communication activities - dissemination Committee reportFirst Report on dissemination and communication activities along the project statistics about number of stakeholders intercepted towards the evaluation of the effectiveness of the actions
Best practices and measures for the installation of the FC gensets in demonstrator venues for future replicationConsidering construction sites and temporary events permitting aspects definition of the guidelines for future installation of the gensets and how permitting issues could be properly modifiedintegrated to welcome EVERYWH2ERE gensets
Final Report on deployment and demonstration activities at construction sitesFinal Report of demonstration activities at construction sites: highlighting critical issues, KPIs, installation and O&M aspects. Formal update of demonstration tracking tool and KPIs Panel
Final Report on dissemination and communication activities - Dissemination Committee reportFinal Report on dissemination and communication activities along the project, statistics about number of stakeholders intercepted towards the evaluation of the effectiveness of the actions
EVERYWH2ERE Gensets Enabling technologies (FC and H2 Storage) Assessment ReportTechnological and Commercial Assessment of the State of the Art FC and hydrogen storage technologies towards the identification of the most suitable ones for gensets realization
Temporary Events and Music Festivals demonstration calendarFollowing the dissemination plan, presentation of a preliminary calendar of the identified festival and events where to test the gensets. Description of the test cases and identification of potential critical point for the demonstration
Final Report on deployment and demonstration activities during temporary eventsFinal Report of demonstration activities at temporary events: highlighting critical issues, KPIs, installation and O&M aspects. Formal update of demonstration tracking tool and KPIs Panel
Market and Stakeholders AnalysisCommercial assessment considering both potential components supplier and end-users’
Final protoype of the 100 kW EVERYWH2ERE genset and guidelines for its operation and maintenance (starting from D4.1)
25 kW EVERYWH2ERE genset prototype: installation and O&M guidelinesFinal protoype of the 25 kW EVERYWH2ERE genset and guidelines for its operation and maintenance (starting from D4.1)
Logistic and Environmental decision support tool for future replication
Starting from D5.3 outcomes, realization of a geo-referred tool able to calculate logistic costs and environmental impact considering gensets installation location and gas supply points location.
E-handbook on guidelines for EVERYWH2ERE replication across Europe covering technical, economic, legislative, social and environmental aspectsStarting from prototype specification, demonstration (D4.7) and stakeholders’ activities outcomes and D6.6, D5.5; redaction of a PDF handbook for the promotion of project outcomes
Definition of project research data to be provided to Open Access
Realization of a project website and activation of social media profile on Twitter and Linkedin