Skip to main content
Weiter zur Homepage der Europäischen Kommission (öffnet in neuem Fenster)
Deutsch Deutsch
CORDIS - Forschungsergebnisse der EU
CORDIS

Making hydrogen affordable to sustainably operate Everywhere in European cities

CORDIS bietet Links zu öffentlichen Ergebnissen und Veröffentlichungen von HORIZONT-Projekten.

Links zu Ergebnissen und Veröffentlichungen von RP7-Projekten sowie Links zu einigen Typen spezifischer Ergebnisse wie Datensätzen und Software werden dynamisch von OpenAIRE abgerufen.

Leistungen

EVERYWH2ERE Demonstration tracking tool and KPIs Panel (öffnet in neuem Fenster)

Realization of an Excel Sheet to be accessible to all the partners to monitor where the gensets will be installed and their performances in terms of KPIs (both KPIs of the project to evaluate the achievement of objectives and KPIs to evaluate genset general impact). This tracking took will be constantly updated during the project lifetime and included as annex of D1.6, D2.2, D8.3, D4.4, D4.5, D4.6, D4.7, D4.8, D4.9, D8.4. This tool has the objective of tracking the status of the installation and deployment of the genset and it will work as a mean of verification and reporting of the achievement of the project KPIs.

Optimized design of an ejector to be integrated in the 25 kW EVERYWH2ERE genset (öffnet in neuem Fenster)

Considering a dedicated modelling and test campaign design of an ejector to be integrated in the 25 kW EVERYWH2ERE genset

Dissemination and Communication Plan (öffnet in neuem Fenster)

Definition of a dissemination and communication plan for the suitable promotion of the project: identification of agreed dissemination measures/procedures/channels, dissemination events, stakeholders engagement and events

First Stakeholders' and cities vision document (öffnet in neuem Fenster)

Report on the preliminary city and industrial stakeholders group activities intervies and events

Test site description and requirements for EVERYWH2ERE gensets specification (öffnet in neuem Fenster)

Description of the identified type of demosites and what are their requirements in terms of technical (energy demand profile) and non-technical (hazardous aspects/installation permitting) requirements towards the most proper genset specification

Identification of current business models, permitting and operating parameters of temporary gensets towards future marketability of EVERYWH2ERE Solutions (öffnet in neuem Fenster)

Preliminary assessment of the replication criteria of the EVERYWH2ERE gensets considering current business models permitting and operating parameters load profile operating hours etc of SotA gensets ICEs battery UPS etc

Final Report on deployment and demonstration activities during music festivals (öffnet in neuem Fenster)

Final Report of demonstration activities at music festival: highlighting critical issues, KPIs, installation and O&M aspects. Formal update of demonstration tracking tool and KPIs Panel

First Report on deployment and demonstration activities at construction sites (öffnet in neuem Fenster)

First Report of demonstration activities at construction sites: highlighting critical issues, KPIs, installation and O&M aspects. Formal update of demonstration tracking tool and KPIs Panel

EVERYWH2ERE Leaflet and Poster (öffnet in neuem Fenster)

Realization of Dissemination material for the promotion of the project and reflecting project visual image

Market and Stakeholders Analysis questionnaire and interview plan (öffnet in neuem Fenster)

Redaction of a questionnaire to be circulated among EVEVRYWH2ERE Industrialcity stakeholders for market and stakeholders interest assessment Preliminary calendar of Stakeholders group activities and interviews

City policies and regulatory framework for the support of the spreading of EVERYWH2ERE FC gensets (öffnet in neuem Fenster)

Considering EVERYWH2ERE city group inputs, guidelines and recommendation for policy redaction and city construction works and temporary events permitting issues adjustments towards EVERYWH2ERE gensets’ spreading

Report on EVERYWH2ERE flexibility performance enhancement and impact on components life and CAPEX (öffnet in neuem Fenster)

Assessment of the most relevant technological modification/improvement at stack, Fuel cell system, control, storage level to be studied and demonstrated in the EVERYWH2ERE project to enlarge FC system lifetime and reduce CAPEX

Life cycle assessment (LCA) of the FC gensets in construction sites and temporary venues (öffnet in neuem Fenster)

LCA report presenting the inventory and impact assessment results obtained of the FC systems and the relevant references also considering demonstration outcomes in the EVERYWH2ERE Demos.

Final Stakeholders' and cities vision document (öffnet in neuem Fenster)

Considering all the stakeholders’ group activities, recommendation and policy for FC genset promotion at city and industrial level

LCC and logistic analysis of the use of the EVERYWH2ERE gensets in different EU countries (öffnet in neuem Fenster)

Considering D5.2, assessment of costs and logistic aspects of the use of the EVERYWH2ERE gensets and hydrogen supply in a LCC approach

Mapping the hydrogen supply point in EU countries (öffnet in neuem Fenster)

Analysis and localization of hydrogen supply point (industrial premises, hydrogen refuelling station, industrial gas commercial retailers and distributors) all around Europe

First Report on deployment and demonstration activities during temporary events (öffnet in neuem Fenster)

First Report of demonstration activities at temporary events: highlighting critical issues, KPIs, installation and O&M aspects. Formal update of demonstration tracking tool and KPIs Panel

Test sites data collections and consolidation for benchmarking with temporary generators technologies (öffnet in neuem Fenster)

Report on the demonstration data collection with a focus on KPIs and benchmark with other gensets’ technologies

First Report on deployment and demonstration activities during music festivals (öffnet in neuem Fenster)

First Report of demonstration activities at music festival: highlighting critical issues, KPIs, installation and O&M aspects. Formal update of demonstration tracking tool and KPIs Panel

Interim Report on dissemination and communication activities - Dissemination Committee report (öffnet in neuem Fenster)

Interim Report on dissemination and communication activities along the project, statistics about number of stakeholders intercepted towards the evaluation of the effectiveness of the actions

Preliminary screening of the environmental impacts of the FC gensets (öffnet in neuem Fenster)

Preliminary LCA and emission report presenting the inventory and impact assessment results obtained of the FC systems and the relevant references also benchmarking with other gensets

First Report on dissemination and communication activities - dissemination Committee report (öffnet in neuem Fenster)

First Report on dissemination and communication activities along the project statistics about number of stakeholders intercepted towards the evaluation of the effectiveness of the actions

Best practices and measures for the installation of the FC gensets in demonstrator venues for future replication (öffnet in neuem Fenster)

Considering construction sites and temporary events permitting aspects definition of the guidelines for future installation of the gensets and how permitting issues could be properly modifiedintegrated to welcome EVERYWH2ERE gensets

Final Report on deployment and demonstration activities at construction sites (öffnet in neuem Fenster)

Final Report of demonstration activities at construction sites: highlighting critical issues, KPIs, installation and O&M aspects. Formal update of demonstration tracking tool and KPIs Panel

Final Report on dissemination and communication activities - Dissemination Committee report (öffnet in neuem Fenster)

Final Report on dissemination and communication activities along the project, statistics about number of stakeholders intercepted towards the evaluation of the effectiveness of the actions

EVERYWH2ERE Gensets Enabling technologies (FC and H2 Storage) Assessment Report (öffnet in neuem Fenster)

Technological and Commercial Assessment of the State of the Art FC and hydrogen storage technologies towards the identification of the most suitable ones for gensets realization

Temporary Events and Music Festivals demonstration calendar (öffnet in neuem Fenster)

Following the dissemination plan, presentation of a preliminary calendar of the identified festival and events where to test the gensets. Description of the test cases and identification of potential critical point for the demonstration

Final Report on deployment and demonstration activities during temporary events (öffnet in neuem Fenster)

Final Report of demonstration activities at temporary events: highlighting critical issues, KPIs, installation and O&M aspects. Formal update of demonstration tracking tool and KPIs Panel

Market and Stakeholders Analysis (öffnet in neuem Fenster)

Commercial assessment considering both potential components supplier and end-users’

100 kW EVERYWH2ERE genset prototype: installation and O&M guidelines (öffnet in neuem Fenster)

Final protoype of the 100 kW EVERYWH2ERE genset and guidelines for its operation and maintenance (starting from D4.1)

25 kW EVERYWH2ERE genset prototype: installation and O&M guidelines (öffnet in neuem Fenster)

Final protoype of the 25 kW EVERYWH2ERE genset and guidelines for its operation and maintenance (starting from D4.1)

H2 Corner Setup (öffnet in neuem Fenster)
Logistic and Environmental decision support tool for future replication (öffnet in neuem Fenster)

Starting from D5.3 outcomes, realization of a geo-referred tool able to calculate logistic costs and environmental impact considering gensets installation location and gas supply points location.

E-handbook on guidelines for EVERYWH2ERE replication across Europe covering technical, economic, legislative, social and environmental aspects (öffnet in neuem Fenster)

Starting from prototype specification, demonstration (D4.7) and stakeholders’ activities outcomes and D6.6, D5.5; redaction of a PDF handbook for the promotion of project outcomes

Data Management Plan (öffnet in neuem Fenster)

Definition of project research data to be provided to Open Access

Public Website and Social Media profile Setup (öffnet in neuem Fenster)

Realization of a project website and activation of social media profile on Twitter and Linkedin

Suche nach OpenAIRE-Daten ...

Bei der Suche nach OpenAIRE-Daten ist ein Fehler aufgetreten

Es liegen keine Ergebnisse vor

Mein Booklet 0 0