PEDR - Plan for the Communication, Dissemination, and Exploitation of Results
(se abrirá en una nueva ventana)
PEDR - Plan for the Communication, Dissemination, and Exploitation of Results (CSJU Mandatory Deliverable 2)
System level mitigations for arc tracking
(se abrirá en una nueva ventana)
Report examining the ability of deploying arc tracking mitigating measures at a system level in a manner that will limit the magnitude of damage during a fault assessing also the impact of protection on the level of risk Recommendations and lessons learned regarding the system level modelling of arc tracking will also be captured
Component design to manage arc tracking
(se abrirá en una nueva ventana)
Report providing recommendations for component design to manage arc tracking in future aerospace systems
Electrical power system models for arc tracking
(se abrirá en una nueva ventana)
Revised electrical power system models suitable for use to estimate the magnitudes and durations of fault current expected during arc tracking events for new HV aerospace system configurations
Recommendations for arc fault testing
(se abrirá en una nueva ventana)
Delivery of final report on recommendations for arc fault testing in future high voltage aerospace systems