PEDR - Plan for the Communication, Dissemination, and Exploitation of Results
(s’ouvre dans une nouvelle fenêtre)
PEDR - Plan for the Communication, Dissemination, and Exploitation of Results (CSJU Mandatory Deliverable 2)
System level mitigations for arc tracking
(s’ouvre dans une nouvelle fenêtre)
Report examining the ability of deploying arc tracking mitigating measures at a system level in a manner that will limit the magnitude of damage during a fault assessing also the impact of protection on the level of risk Recommendations and lessons learned regarding the system level modelling of arc tracking will also be captured
Component design to manage arc tracking
(s’ouvre dans une nouvelle fenêtre)
Report providing recommendations for component design to manage arc tracking in future aerospace systems
Electrical power system models for arc tracking
(s’ouvre dans une nouvelle fenêtre)
Revised electrical power system models suitable for use to estimate the magnitudes and durations of fault current expected during arc tracking events for new HV aerospace system configurations
Recommendations for arc fault testing
(s’ouvre dans une nouvelle fenêtre)
Delivery of final report on recommendations for arc fault testing in future high voltage aerospace systems