PEDR - Plan for the Communication, Dissemination, and Exploitation of Results
(öffnet in neuem Fenster)
PEDR - Plan for the Communication, Dissemination, and Exploitation of Results (CSJU Mandatory Deliverable 2)
System level mitigations for arc tracking
(öffnet in neuem Fenster)
Report examining the ability of deploying arc tracking mitigating measures at a system level in a manner that will limit the magnitude of damage during a fault assessing also the impact of protection on the level of risk Recommendations and lessons learned regarding the system level modelling of arc tracking will also be captured
Component design to manage arc tracking
(öffnet in neuem Fenster)
Report providing recommendations for component design to manage arc tracking in future aerospace systems
Electrical power system models for arc tracking
(öffnet in neuem Fenster)
Revised electrical power system models suitable for use to estimate the magnitudes and durations of fault current expected during arc tracking events for new HV aerospace system configurations
Recommendations for arc fault testing
(öffnet in neuem Fenster)
Delivery of final report on recommendations for arc fault testing in future high voltage aerospace systems