Resultado final
2.5D database created in object mode of the initial “augmented ABR” (piece of software accompanied by a user’s guide). In addition, a report documenting on the ABR layout, including single records expected and specifications which need to be implemented in the initial “augmented ABR” will be provided (“Digital Twin Requirements & Specifications Book”).
Data analyticsDescription and models for data analytics
Updated release of the augmented ABRIncluding the records of the previous release and the specification and implementation of the processes and automation. This deliverable is the updated 2.5D database delivered in D1.2. (a piece of software duly documented in its structure and in its way of use (user’s guide).
Decision support toolsDescription and models for decision support
Merging and data structuring software module for digital twin applicationThe deliverable is a software module allowing the successful merging and data structuration “ready to import” all the data collected in the Augmented ABR DataBase for further exploitation (piece of software duly documented in the functionalities implemented to allow full data set harmonisation)
The output of task 91 shall provide an updated description of any changes to from DX1 the use cases and the high level design of the prototype and live data connectivity to be implemented This will be a living document updated for each intended use case data constraints and results as the prototype is progressed The document will summarise the results and conclude those use cases to be taken forward live data connection
Validation report on decision support toolReport describing results of the demonstrator and validation of KPIs
Dissemination, exploitation and communication reportThis report will detail the activities undertaken during the life of the project its results and established contacts to key stakeholders as well as exploitation activities carried out by partners
Requirements & ArchitectureSystem requirements for the operational tactical and strategic level demonstrator will be developed including architectural views
Description of the Prototype and Live Data Validation ReportThe output of tasks 92 and 93 shall provide an updated description of any changes from D83 to the use cases and the high level design of the prototype and live data connectivity to be implemented This will be a living document updated for each intended use case data constraints and results as the live data connectivity prototype is progressed
Dissemination Exploitation and Communication PlanThis will detail the objectives and strategy for the dissemination of the project, as well as detailing the methods to be used for dissemination and communication.
Final Data Analysis Summary ReportThe output of task 93 shall provide a summary description of the results of the prototyping and big data analysis performed to connect real world data to the algorithms The data to be analysed includes raw points and track circuit data weather data and all possession and fault management systems Any data transformation required shall be documented The document shall cover the KPI results conclusions lessons learnt and suggested next steps along with possible connection to the tactical level SAMP AMP
Description of the PrototypeThe output of tasks 81 82 and 83 shall provide a description of the use cases and the high level design of the prototype and live data connectivity to be implemented This will be a living document updated for each intended use case data constraints and results as the prototype is progressed
Demonstrators Validation ReportD33 will summarise the validation carried out by each demonstrator through the corresponding KPIs identified in Task 32 and how these KPIs are impacting on the whole S2R initiative with the exception of WP9 see amended Task 32
System validation report - TrackThe extent to which the demonstrator satisfies the system requirements will be assessed including validation against the User needs
Contribution to S2R Conceptual Data ModelD32 will include the identification and specification of the IN2SMART2 contribution in terms of CDM and architecture to the CFM S2RCFMIPXCCA012019 to allow an adequate requirement traceability and implementation of the demonstrators
IAMS System Architecture and guidelines for its implementation in the demonstratorsD3.1 will report on the refined and finalised IAMS system architecture, the implementation of the Open Standard Interfaces and provide the guidelines to allow demonstrators to implement the system architecture.
Reporting and assessmentReport on the assessment of approach and implementation
System validation report – BridgesThe extent to which the demonstrator satisfies the system requirements will be assessed including validation against the User needs
Description of the Prototype and Test Data Validation ReportThe output of tasks 85 shall provide an updated description of any changes to from D81 the use cases and the high level design of the prototype The document will summarise the results of the test data validation and conclude those use cases to be taken forward to live data connection
Common approach towards an IAMS Digital TwinD34 will provide the common definitions and approach of the IAMS Digital Twin carried out in IN2SMART2 and indicate possible way forward for future research at S2R level
Data Management PlanProduction and management of the document describing how the Consortium will manage the data produced and consumed by the project. The document will take into consideration also security and privacy aspects.
Data Analysis ReportThe output of task 84 shall provide a description of the big data analysis performed to connect real world data to the algorithms The data to be analysed includes raw points and track circuit data weather data and all possession and fault management systems Any data transformation required shall be documented
Planning and execution of maintenance in selected sections
DemonstrationsDemonstrations in operational environments (Test Tracks); supported by necessary explanatory material as needed.
Remote Condition Monitoring Maintenance Reduction Interventions and Decisions demonstratorDeliverable 93 consists of the system overall demonstrator up to TRL6
Urban Metro IAMS demonstratorDeliverable 5.2 consists of the system overall demonstrator up to TRL6/7.
System demonstration - TrackFinal demonstration
System demonstration – BridgesFinal demonstration
IAMS integration demonstratorD3.5 consists of a demonstrator of the IAMS integration potentialities through a common monitoring solution collecting heterogeneous inputs from various demonstrators.
Digital twin demonstratorThe deliverable is the demonstration that a digital twin of real asset has been developed and operated. It will consist of the last up to date 2.5D database of the asset (i.e. the digital twin) and the results of operations of the software module developed (merging and data structuration, automatic patterns and object recognition, new maintenance planning and asset degradation prediction). The deliverable will be accompanied by an assessment report on the benefits and impact of the digital twin in the maintenance strategy.
IP-DemonstratorStrategical and tactical track asset demonstrator in line with WP3.
Integrated Demonstrator in life environmentA real life demonstration in operational environment on site to be supported by necessary explanatory material as needed.
Rail fastener anomaly detection demonstratorThe TRL 6-7 demonstrator of the rail fastener anomaly detection system using data from an in-service train running at the iron-ore line in Northern Sweden.
Publicaciones
Autores:
Rahimi M, et al
Publicado en:
Proc UK-RAS22, 2022, Página(s) 40-41
Editor:
Aberystwyth University
Autores:
M. Rahimi, H. Liu, M. Rahman, C. Ruiz Carcel, I. D. Cardenas, A. Starr, A. Hall and R. Anderson
Publicado en:
THROUGH-LIFE ENGINEERING SERVICES CONFERENCE (TESCONF) 2021, 2021
Editor:
SSRN
DOI:
10.2139/ssrn.3945953
Autores:
Daniela NAREZO GUZMAN, Judith HEUSEL, Norman WEIK, Susanne REETZ, Thorsten NEUMANN, Douwe BUURSMA, Gerrit SCHRIJVER, Arnout VAN DEN BERG, Serge VAN DEN BROEK, Jörn C. GROOS
Publicado en:
Proceedings of the World Congress on Railway Research 2022, Edición Congress takes place every two years, 2021
Editor:
N/A
Autores:
M. Rahman, H. Liu, M. Rahimi, C. Ruiz Carcel, L. Kirkwood, I. D. Cardenas, A. Starr
Publicado en:
THROUGH-LIFE ENGINEERING SERVICES CONFERENCE (TESCONF) 2021, Edición 16-18 November 2021, 2021
Editor:
SSRN
DOI:
10.2139/ssrn.3945943
Autores:
Rahman M, et al
Publicado en:
Proc UK-RAS22, 2022, Página(s) 82-83
Editor:
Aberystwyth University
Autores:
Mahdi Khosravi, Iman Soleimanmeigouni, Alireza Ahmadi, Arne Nissen, and Xun Xiao
Publicado en:
Measurement , Edición 2022, 2022, ISSN 1873-412X
Editor:
Elsevier
DOI:
10.1016/j.measurement.2022.111707
Autores:
Daniel Fässler, Daniela Narezo Guzman and Thorsten Neumann
Publicado en:
Der Eisenbahningenieur, Edición May-20, 2021, ISSN 0013-2810
Editor:
Tetzlaff Verlag
Autores:
Alice Consilvio, José Solís-Hernández, Noemi Jiménez-Redondo, Paolo Sanetti, Federico Papa, Iñigo Mingolarra-Garaizar
Publicado en:
Sustainability, Edición 12/6, 2020, Página(s) 2544, ISSN 2071-1050
Editor:
MDPI Open Access Publishing
DOI:
10.3390/su12062544
Autores:
Daniel Fässler
Publicado en:
Edición Jul-20, 2021
Editor:
N/A
Buscando datos de OpenAIRE...
Se ha producido un error en la búsqueda de datos de OpenAIRE
No hay resultados disponibles