Livrables
Validation report of laboratory demonstration including exploitation plan Lead BTG M51
Specification of innovations and scenarios for enhanced and integrated line- and yard planningSpecification of innovations and scenarios for enhanced and integrated line and yard planningLead TRV M18
Dissemination and communication strategyDissemination and communication strategy - The strategy will ensure that the project members will efficiently disseminate the results of the project (Lead: DB - M8)
Approval concepts, summarizing the results of task 4.4Approval concepts summarizing the results of task 44 Lead CON M30
Wayside vehicle monitoring for condition based maintenanceSTI System and its functions in EMW, as the outcome of the work to be done in task 4.1 and 4.2
STI System and its functions in EMW as the outcome of the work to be done in task 41 and42 Lead CON M18
Final specification of prototype EMW intermodal, corresponding to task 4.3Final specification of prototype EMW intermodal corresponding to task 43 Lead CON M18
Method development for enhanced and integrated line- and yard planningMethod development for enhanced and integrated line and yard planning Lead TRV M30
Definition of functionalities and description of the development of subsystems and integration of telematics on the wagons and testingDefinition of functionalities and description of the development of subsystems and integration of telematics on the wagons and testing results of the work done in task 51 and in task 52 are included in a report Lead CEIT M40
Demonstration of enhanced and integrated line- and yard planning and possibilities for implementationDemonstration of enhanced and integrated line and yard planning and possibilities forimplementation Lead TRV M36
Final conference final event for presenting the results of WP1 to WP6 Lead DB M40
Usercentric design and development of CBM dashboards in order to test given use cases Demo including exploitation plan
Demonstration and evaluation incl. best usage of the data capture (Demo - including exploitation plan)Demonstration and evaluation incl. best usage of the data capture (Demo – including exploitation plan)
Publications
Auteurs:
Sangeetha Shankar and Judith Heusel and Oliver Böttcher and Akhil Jayant Patil and Benjamin Baasch
Publié dans:
ETR - Eisenbahntechnische Rundschau, 2022, Page(s) 45-49, ISSN 0013-2845
Éditeur:
DVV Media Group
Auteurs:
Ait-Ali, A., & Lidén T.
Publié dans:
European Journal of Transport and Infrastructure Research, Numéro 22(2), 2022, Page(s) 108-131, ISSN 1567-7141
Éditeur:
Technische Universiteit Delft/Delft University of Technology
DOI:
10.18757/ejtir.2022.22.2.6130
Auteurs:
Losada M., Adin I., Perez A., Carlos Ramírez R., Mendizabal J.
Publié dans:
Special Numéro Low Power Consumption and Reliable Wireless Communications for Harsh Environments, Numéro Volume 11; Numéro 6, 2022, Page(s) 1-26, ISSN 2079-9292
Éditeur:
Electronics
DOI:
10.3390/electronics11060943
Recherche de données OpenAIRE...
Une erreur s’est produite lors de la recherche de données OpenAIRE
Aucun résultat disponible