European Commission logo
polski polski
CORDIS - Wyniki badań wspieranych przez UE
CORDIS

Smart data-based assets and efficient rail freight operation

Rezultaty

Validation report of laboratory demonstration (including exploitation plan)

Validation report of laboratory demonstration including exploitation plan Lead BTG M51

Specification of innovations and scenarios for enhanced and integrated line- and yard planning

Specification of innovations and scenarios for enhanced and integrated line and yard planningLead TRV M18

Dissemination and communication strategy

Dissemination and communication strategy - The strategy will ensure that the project members will efficiently disseminate the results of the project (Lead: DB - M8)

Approval concepts, summarizing the results of task 4.4

Approval concepts summarizing the results of task 44 Lead CON M30

Wayside vehicle monitoring for condition based maintenance
STI System and its functions in EMW, as the outcome of the work to be done in task 4.1 and 4.2

STI System and its functions in EMW as the outcome of the work to be done in task 41 and42 Lead CON M18

Final specification of prototype EMW intermodal, corresponding to task 4.3

Final specification of prototype EMW intermodal corresponding to task 43 Lead CON M18

Method development for enhanced and integrated line- and yard planning

Method development for enhanced and integrated line and yard planning Lead TRV M30

Definition of functionalities and description of the development of subsystems and integration of telematics on the wagons and testing

Definition of functionalities and description of the development of subsystems and integration of telematics on the wagons and testing results of the work done in task 51 and in task 52 are included in a report Lead CEIT M40

Demonstration of enhanced and integrated line- and yard planning and possibilities for implementation

Demonstration of enhanced and integrated line and yard planning and possibilities forimplementation Lead TRV M36

Final conference

Final conference final event for presenting the results of WP1 to WP6 Lead DB M40

User-centric design and development of CBM dashboards in order to test given use cases (Demo - including exploitation plan)

Usercentric design and development of CBM dashboards in order to test given use cases Demo including exploitation plan

Demonstration and evaluation incl. best usage of the data capture (Demo - including exploitation plan)

Demonstration and evaluation incl. best usage of the data capture (Demo – including exploitation plan)

Publikacje

Management von großen Sensordatenmengen für die Digitalisierung und Automatisierung im Bahnbereich

Autorzy: Sangeetha Shankar and Judith Heusel and Oliver Böttcher and Akhil Jayant Patil and Benjamin Baasch
Opublikowane w: ETR - Eisenbahntechnische Rundschau, 2022, Strona(/y) 45-49, ISSN 0013-2845
Wydawca: DVV Media Group

Minimal utilization rate for railway maintenance windows: a cost-benefit approach.

Autorzy: Ait-Ali, A., & Lidén T.
Opublikowane w: European Journal of Transport and Infrastructure Research, Numer 22(2), 2022, Strona(/y) 108-131, ISSN 1567-7141
Wydawca: Technische Universiteit Delft/Delft University of Technology
DOI: 10.18757/ejtir.2022.22.2.6130

Connected Heterogenous Multi-Processing Architecture for Digitalization of Freight Railway Transport Applications

Autorzy: Losada M., Adin I., Perez A., Carlos Ramírez R., Mendizabal J.
Opublikowane w: Special Numer Low Power Consumption and Reliable Wireless Communications for Harsh Environments, Numer Volume 11; Numer 6, 2022, Strona(/y) 1-26, ISSN 2079-9292
Wydawca: Electronics
DOI: 10.3390/electronics11060943

Wyszukiwanie danych OpenAIRE...

Podczas wyszukiwania danych OpenAIRE wystąpił błąd

Brak wyników