5G for future RAILway mobile communication system

Deliverables

TOBA Integration Report

This deliverable will detail the conditions of integration for the full TOBA ecosystem including the alignment of developments between the various elements the dependencies on each subsystem and the objectives in terms of supported overall functionalities as well as conflict resolutions scenarios when necessary

Second Lab Test Report

This document will provide a test report related to ETCS and ATO applications, PIS application as well as Voice application limited set as defined within WP1. It will provide as well a result of the tests related to the use cases described in the objectives of this WP.

Test report conclusion from simulated/lab environments

This document will provide conclusions, observations and outcomes of performance simulations from the reports of tests achieved in simulated/lab environments (i.e. WP3 and WP4) to potentially amend or modify FRMCS V1 Specifications (i.e. missing, erroneous or ambiguous definitions) and to identify technical constraints related to implementation issues.

First Lab Test Report

The lab testing reports outlines and details the different lab test phases for each application. It documents the work done and details the achieved results for the integration of prototypes into the 5G infrastructure and the validation of the communication capabilities in the lab environment in line with the lab test strategy document elaborated in WP1. It covers Voice, TCMS, ETCS, CCTV/Video test results, as well as cross-border testing.

Test report conclusion from real-world environment

This document will provide conclusions, observations and outcomes of performance measurements from the reports of tests achieved in real-world environment (i.e. WP5) to potentially amend or modify FRMCS V1 Specifications (i.e. missing, erroneous or ambiguous definitions) and to identify technical constraints related to implementation issues.

First Lab Test Setup Report

This report outlines the lab setup integration and verification of radio compatibility of 5G radio modules and other public band modules depending on spectrum Based on WP1 definition network functionality for GSMR FRMCS interworking will be simulated

Test Results on Field Trial on FRMCS Functions and Performance

This deliverable from Task 5.2 will provide a comprehensive description of test execution, an exhaustive list of tests performed and the results obtained during the execution of test plan.

Conclusion Report on 5G FRMCS Field Trials

This deliverable from Task 5.1 will provide a summary which will outline results of the different field tests performed in Task 5.2 and 5.3 and will elaborate conclusion on the outcomes of the test. It will highlight the conclusions related to border crossing for preparation of introduction of FRMCS in Europe. Furthermore it will capture key findings and considerations to be taken into account for future experimentation and deployment of 5G as an enabler for the digitalisation in rail sector.

Second Lab Integration and Architecture Report

This document will provide a full description of environmental conditions for the achievement of tests including integration considerations and technical architecture detailing all subsystems

Implementation of the selected scenarios, Analysis and Conclusion

This deliverable will describe the implementation of the different chosen scenario the parameters for the simulations and the KPI chosen for the analysis It will give the results analysis and will draw the conclusion for coexistence between road and rail systems

Scenarios for Rail and road communication system coexistence

Definition of some representative cases for coexistence between Rail and Automotive communication systems identification of a set of cases for the simulation work foreseen in task 63 It is foreseen that the task will deliver a comprehensive description of scenarios and cases with definition of involved applications technologies etc

First Lab Integration and Architecture Description

This document will provide a full description of environmental conditions for the achievement of tests including integration considerations and technical architecture detailing all subsystems

Test Report related to integration of applications within TOBA

This deliverable will provide a report which will outline the different work streams performed in WP2 and describe the individual results and outcomes per task. A summary and assessment of the results will be created in the light of the overall goals of the project and the specific targets of WP2. It will also detail the role and interaction of applications within the prototypes. Furthermore it will capture key findings and considerations to be taken into account for following lab and field test related activities and potential feedback to WP1.

Dissemination, communication and exploitation activity report.

Report summarising all communication, dissemination and exploitation activities and their impact. It will include a report on the Advisory Board activities.

Test Plan

This document will define test conditions ie test suites test cases which will be conducted in a set of pilot tests labs field test procedures and test purposesThis includes but is not limited to System subsystems building blocks and equipment under test Test infrastructure Test procedures and Test plan ie test configuration test descriptions including essential requirements to be tested

TOBA Architecture Report

This deliverable will provide the conclusions on the final architecture defined for the TOBA ecosystem including physical protocol and application interfaces with the various onboard subsystems

Second Lab Test Setup Report

This report outlines the lab setup and details the different lab test phases for each application and TOBA based on WP1 definition It documents the work done and details the achieved results for the integration of prototypes into the 5G infrastructure and the validation of the communication capabilities in the lab environment in line with the lab test strategy document elaborated in WP1

Test results on Field Trial for Cross-border Scenario

This deliverable from Task 5.3 will provide an comprehensive description of test execution, an exhaustive list of tests performed and the results obtained during the execution of test plan.

Publications

Experimental Trials for the Future Railway Mobile Communication System in 5GRail Project

Author(s): S. Tardif et al.
Published in: 2023 IEEE 97th Vehicular Technology Conference (VTC2023-Spring), Issue 97 / 20-23 June 2023 / Annual / Proceedings, 2023, Page(s) pp. 1-5, ISBN 979-8-3503-1114-3
Publisher: IEEE EXPLORE
DOI: 10.1109/vtc2023-spring57618.2023.10199568

Implementing Edge Computing Architectures for Railway Applications: An example Using the Emu5GNet Platform

Author(s): Tidiane Sylla; Leo Mendiboure; Marion Berbineau; Radheshyam Singh; José Soler; Lars Dittmann
Published in: 2023 IEEE 97th Vehicular Technology Conference (VTC2023-Spring), Issue 20-23 June 2023 / Annual, 2023, ISBN 979-8-3503-1114-3
Publisher: IEEE Xplore
DOI: 10.1109/vtc2023-spring57618.2023.10200145

5GRAIL paves the way to the Future Railway Mobile Communication System Introduction

Author(s): Vassiliki Nikolopoulou; Dan Mandoc; Farid Bazizi; Michael Kloecker; Sébastien Tardif; Bernd Holfeld; Guillaume Jornod Nazih Salhab; Marion Berbineau; Stefanos Gogos
Published in: 2022 IEEE Future Networks World Forum (FNWF), Issue 10-14 October 2022, 2023, ISBN 978-1-6654-6250-1
Publisher: IEEE
DOI: 10.1109/fnwf55208.2022.00018

Train Antenna Requirements, Design and Integration for 5GRAIL Project

Author(s): N. Salhab, A. Haidar, J. J. Muñoz and C. Reboul
Published in: 2023 IEEE 97th Vehicular Technology Conference (VTC2023-Spring), Issue 97 / 20-23 June 2023 / Proceedings / Annual, 2023, Page(s) pp. 1-5, ISBN 979-8-3503-1114-3
Publisher: IEEE Explore
DOI: 10.1109/vtc2023-spring57618.2023.10199389