Risultati finali
This deliverable will detail the conditions of integration for the full TOBA ecosystem, including the alignment of developments between the various elements, the dependencies on each sub-system and the objectives in terms of supported overall functionalities, as well as conflict resolutions scenarios when necessary.
Second Lab Test Report (si apre in una nuova finestra)This document will provide a test report related to ETCS and ATO applications, PIS application as well as Voice application limited set as defined within WP1. It will provide as well a result of the tests related to the use cases described in the objectives of this WP.
FRMCS Performance measurement methodology (si apre in una nuova finestra)This deliverable will provide a summary of results from the studies performed to elaborate a performance measuments methology and will describe assessment of this methodology used during field test related activities. This document will contribute to the preparation of 5G FRMCS operational deployment in Europe, including for cross border conditions.
Test report conclusion from simulated/lab environments (si apre in una nuova finestra)This document will provide conclusions, observations and outcomes of performance simulations from the reports of tests achieved in simulated/lab environments (i.e. WP3 and WP4) to potentially amend or modify FRMCS V1 Specifications (i.e. missing, erroneous or ambiguous definitions) and to identify technical constraints related to implementation issues.
First Lab Test Report (si apre in una nuova finestra)The lab testing reports outlines and details the different lab test phases for each application. It documents the work done and details the achieved results for the integration of prototypes into the 5G infrastructure and the validation of the communication capabilities in the lab environment in line with the lab test strategy document elaborated in WP1. It covers Voice, TCMS, ETCS, CCTV/Video test results, as well as cross-border testing.
Test report conclusion from real-world environment (si apre in una nuova finestra)This document will provide conclusions, observations and outcomes of performance measurements from the reports of tests achieved in real-world environment (i.e. WP5) to potentially amend or modify FRMCS V1 Specifications (i.e. missing, erroneous or ambiguous definitions) and to identify technical constraints related to implementation issues.
First Lab Test Setup Report (si apre in una nuova finestra)This report outlines the lab setup, integration and verification of radio compatibility of 5G radio modules and other public band modules depending on spectrum. Based on WP1 definition, network functionality for GSM-R – FRMCS interworking will be simulated.
Test Results on Field Trial on FRMCS Functions and Performance (si apre in una nuova finestra)This deliverable from Task 5.2 will provide a comprehensive description of test execution, an exhaustive list of tests performed and the results obtained during the execution of test plan.
Conclusion Report on 5G FRMCS Field Trials (si apre in una nuova finestra)This deliverable from Task 5.1 will provide a summary which will outline results of the different field tests performed in Task 5.2 and 5.3 and will elaborate conclusion on the outcomes of the test. It will highlight the conclusions related to border crossing for preparation of introduction of FRMCS in Europe. Furthermore it will capture key findings and considerations to be taken into account for future experimentation and deployment of 5G as an enabler for the digitalisation in rail sector.
Second Lab Integration and Architecture Report (si apre in una nuova finestra)This document will provide a full description of environmental conditions for the achievement of tests, including integration considerations and technical architecture detailing all sub-systems.
Implementation of the selected scenarios, Analysis and Conclusion (si apre in una nuova finestra)This deliverable will describe the implementation of the different chosen scenario, the parameters for the simulations and the KPI chosen for the analysis. It will give the results analysis and will draw the conclusion for coexistence between road and rail systems.
Scenarios for Rail and road communication system coexistence (si apre in una nuova finestra)Definition of some representative cases for coexistence between Rail and Automotive communication systems, identification of a set of cases for the simulation work foreseen in task 6.3. It is foreseen that the task will deliver a comprehensive description of scenarios and cases, with definition of involved applications, technologies, etc.
First Lab Integration and Architecture Description (si apre in una nuova finestra)This document will provide a full description of environmental conditions for the achievement of tests, including integration considerations and technical architecture detailing all sub-systems.
Test Report related to integration of applications within TOBA (si apre in una nuova finestra)This deliverable will provide a report which will outline the different work streams performed in WP2 and describe the individual results and outcomes per task. A summary and assessment of the results will be created in the light of the overall goals of the project and the specific targets of WP2. It will also detail the role and interaction of applications within the prototypes. Furthermore it will capture key findings and considerations to be taken into account for following lab and field test related activities and potential feedback to WP1.
Dissemination, communication and exploitation activity report. (si apre in una nuova finestra)Report summarising all communication, dissemination and exploitation activities and their impact. It will include a report on the Advisory Board activities.
Test Plan (si apre in una nuova finestra)This document will define test conditions (i.e. test suites & test cases which will be conducted in a set of pilot tests - labs & field), test procedures and test purposes.This includes but is not limited to System, subsystems, building blocks and equipment under test, Test infrastructure, Test procedures, and Test plan (i.e. test configuration, test descriptions including essential requirements to be tested).
TOBA Architecture Report (si apre in una nuova finestra)This deliverable will provide the conclusions on the final architecture defined for the TOBA ecosystem, including physical, protocol and application interfaces with the various on-board sub-systems.
Second Lab Test Setup Report (si apre in una nuova finestra)This report outlines the lab setup and details the different lab test phases for each application and TOBA based on WP1 definition. It documents the work done and details the achieved results for the integration of prototypes into the 5G infrastructure and the validation of the communication capabilities in the lab environment in line with the lab test strategy document elaborated in WP1.
Test results on Field Trial for Cross-border Scenario (si apre in una nuova finestra)This deliverable from Task 5.3 will provide an comprehensive description of test execution, an exhaustive list of tests performed and the results obtained during the execution of test plan.
Pubblicazioni
Autori:
S. Tardif et al.
Pubblicato in:
2023 IEEE 97th Vehicular Technology Conference (VTC2023-Spring), Numero 97 / 20-23 June 2023 / Annual / Proceedings, 2023, Pagina/e pp. 1-5, ISBN 979-8-3503-1114-3
Editore:
IEEE EXPLORE
DOI:
10.1109/vtc2023-spring57618.2023.10199568
Autori:
Tidiane Sylla; Leo Mendiboure; Marion Berbineau; Radheshyam Singh; José Soler; Lars Dittmann
Pubblicato in:
2023 IEEE 97th Vehicular Technology Conference (VTC2023-Spring), Numero 20-23 June 2023 / Annual, 2023, ISBN 979-8-3503-1114-3
Editore:
IEEE Xplore
DOI:
10.1109/vtc2023-spring57618.2023.10200145
Autori:
Vassiliki Nikolopoulou; Dan Mandoc; Farid Bazizi; Michael Kloecker; Sébastien Tardif; Bernd Holfeld; Guillaume Jornod
Nazih Salhab; Marion Berbineau; Stefanos Gogos
Pubblicato in:
2022 IEEE Future Networks World Forum (FNWF), Numero 10-14 October 2022, 2023, ISBN 978-1-6654-6250-1
Editore:
IEEE
DOI:
10.1109/fnwf55208.2022.00018
Autori:
N. Salhab, A. Haidar, J. J. Muñoz and C. Reboul
Pubblicato in:
2023 IEEE 97th Vehicular Technology Conference (VTC2023-Spring), Numero 97 / 20-23 June 2023 / Proceedings / Annual, 2023, Pagina/e pp. 1-5, ISBN 979-8-3503-1114-3
Editore:
IEEE Explore
DOI:
10.1109/vtc2023-spring57618.2023.10199389
È in corso la ricerca di dati su OpenAIRE...
Si è verificato un errore durante la ricerca dei dati su OpenAIRE
Nessun risultato disponibile