CORDIS fournit des liens vers les livrables publics et les publications des projets HORIZON.
Les liens vers les livrables et les publications des projets du 7e PC, ainsi que les liens vers certains types de résultats spécifiques tels que les jeux de données et les logiciels, sont récupérés dynamiquement sur OpenAIRE .
Livrables
This deliverable will detail the conditions of integration for the full TOBA ecosystem, including the alignment of developments between the various elements, the dependencies on each sub-system and the objectives in terms of supported overall functionalities, as well as conflict resolutions scenarios when necessary.
Second Lab Test Report (s’ouvre dans une nouvelle fenêtre)This document will provide a test report related to ETCS and ATO applications, PIS application as well as Voice application limited set as defined within WP1. It will provide as well a result of the tests related to the use cases described in the objectives of this WP.
FRMCS Performance measurement methodology (s’ouvre dans une nouvelle fenêtre)This deliverable will provide a summary of results from the studies performed to elaborate a performance measuments methology and will describe assessment of this methodology used during field test related activities. This document will contribute to the preparation of 5G FRMCS operational deployment in Europe, including for cross border conditions.
Test report conclusion from simulated/lab environments (s’ouvre dans une nouvelle fenêtre)This document will provide conclusions, observations and outcomes of performance simulations from the reports of tests achieved in simulated/lab environments (i.e. WP3 and WP4) to potentially amend or modify FRMCS V1 Specifications (i.e. missing, erroneous or ambiguous definitions) and to identify technical constraints related to implementation issues.
First Lab Test Report (s’ouvre dans une nouvelle fenêtre)The lab testing reports outlines and details the different lab test phases for each application. It documents the work done and details the achieved results for the integration of prototypes into the 5G infrastructure and the validation of the communication capabilities in the lab environment in line with the lab test strategy document elaborated in WP1. It covers Voice, TCMS, ETCS, CCTV/Video test results, as well as cross-border testing.
Test report conclusion from real-world environment (s’ouvre dans une nouvelle fenêtre)This document will provide conclusions, observations and outcomes of performance measurements from the reports of tests achieved in real-world environment (i.e. WP5) to potentially amend or modify FRMCS V1 Specifications (i.e. missing, erroneous or ambiguous definitions) and to identify technical constraints related to implementation issues.
First Lab Test Setup Report (s’ouvre dans une nouvelle fenêtre)This report outlines the lab setup, integration and verification of radio compatibility of 5G radio modules and other public band modules depending on spectrum. Based on WP1 definition, network functionality for GSM-R – FRMCS interworking will be simulated.
Test Results on Field Trial on FRMCS Functions and Performance (s’ouvre dans une nouvelle fenêtre)This deliverable from Task 5.2 will provide a comprehensive description of test execution, an exhaustive list of tests performed and the results obtained during the execution of test plan.
Conclusion Report on 5G FRMCS Field Trials (s’ouvre dans une nouvelle fenêtre)This deliverable from Task 5.1 will provide a summary which will outline results of the different field tests performed in Task 5.2 and 5.3 and will elaborate conclusion on the outcomes of the test. It will highlight the conclusions related to border crossing for preparation of introduction of FRMCS in Europe. Furthermore it will capture key findings and considerations to be taken into account for future experimentation and deployment of 5G as an enabler for the digitalisation in rail sector.
Second Lab Integration and Architecture Report (s’ouvre dans une nouvelle fenêtre)This document will provide a full description of environmental conditions for the achievement of tests, including integration considerations and technical architecture detailing all sub-systems.
Implementation of the selected scenarios, Analysis and Conclusion (s’ouvre dans une nouvelle fenêtre)This deliverable will describe the implementation of the different chosen scenario, the parameters for the simulations and the KPI chosen for the analysis. It will give the results analysis and will draw the conclusion for coexistence between road and rail systems.
Scenarios for Rail and road communication system coexistence (s’ouvre dans une nouvelle fenêtre)Definition of some representative cases for coexistence between Rail and Automotive communication systems, identification of a set of cases for the simulation work foreseen in task 6.3. It is foreseen that the task will deliver a comprehensive description of scenarios and cases, with definition of involved applications, technologies, etc.
First Lab Integration and Architecture Description (s’ouvre dans une nouvelle fenêtre)This document will provide a full description of environmental conditions for the achievement of tests, including integration considerations and technical architecture detailing all sub-systems.
Test Report related to integration of applications within TOBA (s’ouvre dans une nouvelle fenêtre)This deliverable will provide a report which will outline the different work streams performed in WP2 and describe the individual results and outcomes per task. A summary and assessment of the results will be created in the light of the overall goals of the project and the specific targets of WP2. It will also detail the role and interaction of applications within the prototypes. Furthermore it will capture key findings and considerations to be taken into account for following lab and field test related activities and potential feedback to WP1.
Dissemination, communication and exploitation activity report. (s’ouvre dans une nouvelle fenêtre)Report summarising all communication, dissemination and exploitation activities and their impact. It will include a report on the Advisory Board activities.
Test Plan (s’ouvre dans une nouvelle fenêtre)This document will define test conditions (i.e. test suites & test cases which will be conducted in a set of pilot tests - labs & field), test procedures and test purposes.This includes but is not limited to System, subsystems, building blocks and equipment under test, Test infrastructure, Test procedures, and Test plan (i.e. test configuration, test descriptions including essential requirements to be tested).
TOBA Architecture Report (s’ouvre dans une nouvelle fenêtre)This deliverable will provide the conclusions on the final architecture defined for the TOBA ecosystem, including physical, protocol and application interfaces with the various on-board sub-systems.
Second Lab Test Setup Report (s’ouvre dans une nouvelle fenêtre)This report outlines the lab setup and details the different lab test phases for each application and TOBA based on WP1 definition. It documents the work done and details the achieved results for the integration of prototypes into the 5G infrastructure and the validation of the communication capabilities in the lab environment in line with the lab test strategy document elaborated in WP1.
Test results on Field Trial for Cross-border Scenario (s’ouvre dans une nouvelle fenêtre)This deliverable from Task 5.3 will provide an comprehensive description of test execution, an exhaustive list of tests performed and the results obtained during the execution of test plan.
Publications
Auteurs:
S. Tardif et al.
Publié dans:
2023 IEEE 97th Vehicular Technology Conference (VTC2023-Spring), Numéro 97 / 20-23 June 2023 / Annual / Proceedings, 2023, Page(s) pp. 1-5, ISBN 979-8-3503-1114-3
Éditeur:
IEEE EXPLORE
DOI:
10.1109/vtc2023-spring57618.2023.10199568
Auteurs:
Tidiane Sylla; Leo Mendiboure; Marion Berbineau; Radheshyam Singh; José Soler; Lars Dittmann
Publié dans:
2023 IEEE 97th Vehicular Technology Conference (VTC2023-Spring), Numéro 20-23 June 2023 / Annual, 2023, ISBN 979-8-3503-1114-3
Éditeur:
IEEE Xplore
DOI:
10.1109/vtc2023-spring57618.2023.10200145
Auteurs:
Vassiliki Nikolopoulou; Dan Mandoc; Farid Bazizi; Michael Kloecker; Sébastien Tardif; Bernd Holfeld; Guillaume Jornod
Nazih Salhab; Marion Berbineau; Stefanos Gogos
Publié dans:
2022 IEEE Future Networks World Forum (FNWF), Numéro 10-14 October 2022, 2023, ISBN 978-1-6654-6250-1
Éditeur:
IEEE
DOI:
10.1109/fnwf55208.2022.00018
Auteurs:
N. Salhab, A. Haidar, J. J. Muñoz and C. Reboul
Publié dans:
2023 IEEE 97th Vehicular Technology Conference (VTC2023-Spring), Numéro 97 / 20-23 June 2023 / Proceedings / Annual, 2023, Page(s) pp. 1-5, ISBN 979-8-3503-1114-3
Éditeur:
IEEE Explore
DOI:
10.1109/vtc2023-spring57618.2023.10199389
Recherche de données OpenAIRE...
Une erreur s’est produite lors de la recherche de données OpenAIRE
Aucun résultat disponible