CORDIS fournit des liens vers les livrables publics et les publications des projets HORIZON.
Les liens vers les livrables et les publications des projets du 7e PC, ainsi que les liens vers certains types de résultats spécifiques tels que les jeux de données et les logiciels, sont récupérés dynamiquement sur OpenAIRE .
Livrables
This public report will detail the industrial pilot tests of task 6.5
In depth hydration study and model of calcined BR composite cement (s’ouvre dans une nouvelle fenêtre)This public report covers the Task 3.4 activities and details the impact of calcined BR on cement hydration kinetics, products and microstructure. The results will be integrated in a thermodynamics-based hydration model for calcined BR composite cement.
Evaluation of modified BR as SCM (s’ouvre dans une nouvelle fenêtre)This public report will summarize the findings of task 6.1 on the potential pre-requisites for using BR in cement products at amounts above 30%.
Report on Bauxite Residue de-alkalinisation in the alumina plant (s’ouvre dans une nouvelle fenêtre)This public report will detail the progress achieved in further optimizing and applying the de-alkalinisation technology to different BRs. At least one scientific publication is expected from this activity.
Globalized Feasibility (s’ouvre dans une nouvelle fenêtre)This public report details the feasibility of each technology to be used in a generic’ alumina plant . (Dissemination: Public)
Dissemination Kit (s’ouvre dans une nouvelle fenêtre)The ReActiv Dissemination kit, including templates and others, as defined in Task 8.1
Report on waste inventory (s’ouvre dans une nouvelle fenêtre)This public report will indicate the key findings of Task 2.2.An intermediate report will be produced at M15.
Report on the real-scale testing of cements containing modified BR as SCM (s’ouvre dans une nouvelle fenêtre)This public report will detail the industrial pilot tests of task 6.3
ReActiv technology flow-sheeting (s’ouvre dans une nouvelle fenêtre)This work will be included in the publicly available LCA reports (D1.2), which will detail the various processing routes based on the validated flowcharts and unit processes generated in Task 1.1. An intermediate report will be produced at M24. (Dissemination: Public).
Risk Management report and updates (s’ouvre dans une nouvelle fenêtre)Project follow-up of the risks with their impact/occurrence likelihood and the related mitigation plans. This report is kept confidential as it is clearly intended for internal consortium use. Intermediate reports will be produced at M12 and M24
Evaluation of CSA-F clinker produced using BR (s’ouvre dans une nouvelle fenêtre)This public report will summarize the findings of task 6.4 on the novel cement clinker production.
Life cycle assessment of by-product utilisation in cement binders (s’ouvre dans une nouvelle fenêtre)This publicly available report will include the results of the LCA, and LCA-NORM studies carried out in Task 1.2. These results will indicate the life cycle environmental performance of BR and other by-product utilization in cement binders normalized to Europe and global environmental impacts (at least two publications are expected from this work). An intermediate report will be produced at M24.(Dissemination: Public)
Optimization of BR smelting for SCM slag production (s’ouvre dans une nouvelle fenêtre)This public report will include the results of Task 5.1 (at least one publication or conference presentation is expected from this work).
Assessment of the implication of Bauxite Residue based products on concrete durability - Initial release (s’ouvre dans une nouvelle fenêtre)This public report will detail the initial findings of task 6.6 along with a bibliographic review of the subject matter.
Guidance on Bauxite Residue modification (s’ouvre dans une nouvelle fenêtre)This public report will summarize the finding of task 6.1 on the potential pre-requisites for using BR in cement products at amounts above 30%.
Assessment of the implication of bauxite residue based products on concrete durability - Final Release (s’ouvre dans une nouvelle fenêtre)This public report will detail the final findings of task 6.6
Report on optimisation of calcined BR properties for use as SCM (s’ouvre dans une nouvelle fenêtre)This report treats the Task 3.3 activities and documents the relationship between calcined BR physical and chemical properties and technical and environmental performance as SCM in composite cement.
Optimization tests on clinker production and hydration behaviour (s’ouvre dans une nouvelle fenêtre)This public report will include the results of the testing of BR at bench scale (at least one publication or conference presentation is expected from this work).
Report on BR calcination process optimization (s’ouvre dans une nouvelle fenêtre)This report describes the Task 3.2 activities on the tailoring of calcination process technology to consortium BRs
Pilot plant results (s’ouvre dans une nouvelle fenêtre)This public report will include the results of the pilot scale demonstration for production of vitrified BR at KUL (Subtask 4.1.4.1). This report will also include a techno-economic analysis of the demonstrated process.
Phase diagrams for bauxite residue-based cement binders. (s’ouvre dans une nouvelle fenêtre)This publicly available report will include the thermodynamic modelling results generated in Task 1.3. It will highlight target chemical compositions and thus SCM mixtures for (‘circular’) cement binder innovation (at least two publications are expected from this work). An intermediate report will be produced at M24.(Dissemination: Public)
Slag processing for Ti removal (s’ouvre dans une nouvelle fenêtre)This public report will include the results of Task 5.2 (at least one publication or conference presentation is expected from this work).
Optimization tests on vitrification of BR and behaviour in blended cements (s’ouvre dans une nouvelle fenêtre)This public report will include the results of the testing of BR at bench scale (at least one publication or conference presentation is expected from this work).
Communication Plan-Final (s’ouvre dans une nouvelle fenêtre)The ReActiv Communication Plan as defined in Task 8.2, will, in its first release at M12, detail all specific actions planned for maximizing the project’s impacts. The final release, at M48, will capture all actions undertaken.
Stakeholders' Analysis Public Release (s’ouvre dans une nouvelle fenêtre)This public report will contain the general findings of D7.2, having removed any confidential and sensitive information therein.
Pilot scale BR smelting (s’ouvre dans une nouvelle fenêtre)This public report will include the results of pilot demonstration at Task 5.3
Report on BR calcination screening (s’ouvre dans une nouvelle fenêtre)This report covers the Task 3.1 screening activities, setting the stage for further technology and product optimisation in Tasks 3.2 and 3.3.
Report on pilot production of calcined BR SCM (s’ouvre dans une nouvelle fenêtre)This public report covers the task 3.5 activities and describes the preparations, the execution and the results of the BR calcination piloting campaign.
Communication Plan - First Release (s’ouvre dans une nouvelle fenêtre)The ReActiv Communication Plan as defined in Task 8.2, will, in its first release at M12, detail all specific actions planned for maximizing the projects impacts. The final release, at M48, will capture all actions undertaken.
Recommendations for policy and standardization (s’ouvre dans une nouvelle fenêtre)Report about the industry recommendations regarding standardisation and policies to enable the full deployment of ReActiv across Europe.
Cross-Fertilization Workshops will be organized under Task 8.3 in M12, M24 and M46 in order to align the ReActiv technological solution to new research findings through other projects and to define the starting point for further innovation after project ending.
"Cross-Fertilization Workshop #2" (s’ouvre dans une nouvelle fenêtre)Cross-Fertilization Workshops will be organized under Task 8.3 in M12, M24 and M46 in order to align the ReActiv technological solution to new research findings through other projects and to define the starting point for further innovation after project ending.
"Cross-Fertilization Workshop #1" (s’ouvre dans une nouvelle fenêtre)Cross-Fertilization Workshops will be organized under Task 8.3 in M12, M24 and M46 in order to align the ReActiv technological solution to new research findings through other projects and to define the starting point for further innovation after project ending.
Launching and maintenance of the REACTIV website under Task 8.1
The first version of the DMP developed under Task 8.2, will be provided at M4 of the project. Since DMPs are expected to mature during the project, a more developed version of the plan will be included as additional deliverable at M30. This new version will include improvements based on lessons learned during the first half of the project
Data Management Plan (DMP) (s’ouvre dans une nouvelle fenêtre)The first version of the DMP developed under Task 8.2, will be provided at M4 of the project. Since DMPs are expected to mature during the project, a more developed version of the plan will be included as additional deliverable at M30. This new version will include improvements based on lessons learned during the first half of the project
Publications
Auteurs:
Rahul Roy, Tobias Hertel and Yiannis Pontikes
Publié dans:
Material Proceedings, Numéro Mater. Proc. 2021, 5(1), 124, 2021, ISSN 2673-4605
Éditeur:
MDPI
DOI:
10.3390/materproc2021005124
Auteurs:
Rahul Roy, Tobias Hertel and Yiannis Pontikes
Publié dans:
TRAVAUX 50, Proceedings of the 39th International ICSOBA Conference, 22 - 24 November 2021, Numéro 50, 2021
Éditeur:
ICSOBA
Auteurs:
Maria Georgiades, Izhar Hussain Shah , Rupert J. Myers
Publié dans:
10th International Conference on Life Cycle Management, 2021
Éditeur:
10th International Conference on Life Cycle Management
Auteurs:
Arne Peys, Ruben Snellings
Publié dans:
TRAVAUX 50, Proceedings of the 39th International ICSOBA Conference, 22 - 24 November 2021, Numéro 50, 2021, ISSN 2518-332X
Éditeur:
ICSOBA
Auteurs:
Efthymios Balomenos, Panagiotis Davris, Dimitris Sparis, Danai Marinos, Michalis Vafeias, Sevasti Koutsoupa, Stavroula Koutalidi, Dimitrios Panias and Ioannis Karnachoritis
Publié dans:
TRAVAUX 50, Proceedings of the 39th International ICSOBA Conference, 22 - 24 November 2021, Numéro 50, 2021
Éditeur:
ICSOBA
Auteurs:
Izhar Hussain Shah , Rupert J. Myers
Publié dans:
World resources forum 12-14/10/2021, 2021
Éditeur:
World resources forum
Auteurs:
ReActiv Consortium
Publié dans:
2021
Éditeur:
Reactiv
Recherche de données OpenAIRE...
Une erreur s’est produite lors de la recherche de données OpenAIRE
Aucun résultat disponible