European Commission logo
français français
CORDIS - Résultats de la recherche de l’UE
CORDIS

BIM2TWIN: Optimal Construction Management & Production Control

Livrables

Report on Privacy & Ethics management

A report which specifies how privacy and ethics will be handled in the Digital Building Twin platform

Requirements Specification for Digital Twin-Supported Progress Monitoring and Quality Control

This report will be an information delivery manual that will provide the input needed in other WP24 for the information system product and process design

First collection of requests for improvement

This deliverable will evaluate the behaviour of the DBT platform from the point of view of the construction managers end users considering the KPIs identified in WP1 The first version of the platform will be evaluated in month 28 These user feedbacks will be taken into account by tasks WP2 to WP7 to increase DTS and DBT platform quality and improve enduser acceptance

Requirements Analysis and Use Case Definition

The deliverable includes Requirements analysis digital occupational health and safety OHS process definition of use cases later tested on construction sites

API Specification for the Digital Twin Platform

This deliverable is the specification of the API exposed by the Digital Twin PlatformNote an interim version of this report will be delivered and reviewed at M18

Digital Building Twin Requirements analysis and Data model

This deliverable is a report documenting the technical requirements identified and specifying the developed data models using UML notation and the workflows and processing chains using BPMN notation

Technical requirements specification for equipment optimization

This report will provide the input from WP6 for the information system design carried out in WP2

Specification of tracking technologies

The various tracking technologies are compiled and evaluated for the different construction equipment and their use on the construction site This includes the documentation of advantages and disadvantages and possibilities for installation on the construction site or directly on the equipment This will provide a basis for a selection decision

Definition of the digital workflows for the construction process

This deliverable is a comprehensive description of the optimal construction process by means of IDM and BPMN standards clearly specifying actors toolsservices and data exchanges

As-is practices analysis and end-user requirements

A report that will compile the conclusions of the research in the stateoftheart construction processes and formalize the enduser requirements linking them to the pilot cases through a verification matrix

Specification for automated control of construction equipment

The possibilities for controlling construction equipment are compiled and evaluated Furthermore concepts for providing the recorded information for a control system are documented It is also explained which information must be collected to enable direct controlNote an interim version of this deliverable will be delivered and reviewed at M18

KPIs for evaluating the construction process behaviour

The technical definition of the KPI framework for providing the situational awareness and quantitatively assessing the process performance

Data capture hardware review and selection

This report will be the specification of the onsite datacapture hardware selection based on the analysis done regarding tools needs price reliability adequacy to the pilot projects etc

Requirements Specification for Simulation and Prediction

This report will provide the input from WP7 for the information system design carried out in WP2

Digital Twin for Prevention through Design (PtD)

The deliverable (Software + report) includes: Safety domain model, safety rule checking for as-planned safety model (later to be compared against as-is safety model), Process for embedding digital methods in safety planning

DMP plan

This deliverable will provide the indications to manage all research data and metadata explaining how to collect structure share and store the information gathered or raised across the projects lifecycle The DMP will be constantly updated and improved in accordance to all the partners and to the outcomes of the project It will act as a guide both during project development and after project conclusion

Project website and visual identity

A project website will be developed and constantly updated with project progress information and related news It will represent the first touch point with the project consortium for potential stakeholders and an always uptodate showcase for project results

Publications

Predictive Simulation for Automated Decision-Support in Production Planning and Control

Auteurs: Timson Yeung; Jhonattan Guillermo Martinez Ribón; Li-Or Sharoni; Rafael Sacks; Tomi Pitkäranta
Publié dans: Crossref, Numéro 2, 2023
Éditeur: IGLC
DOI: 10.24928/2023/0186

Generating geometric digital twins of buildings: a review

Auteurs: Viktor Drobnyi; Yasmin Fathy; Ioannis Brilakis
Publié dans: Crossref, Numéro 13, 2022
Éditeur: UCAM
DOI: 10.35490/ec3.2022.153

Geometry updating for digital twins of buildings: a review to derive a new geometry-based object class hierarchy

Auteurs: Zhiqi Hu; Yasmin Fathy; Ioannis Brilakis
Publié dans: Crossref, Numéro 13, 2022
Éditeur: European Conference on Computing in Construction
DOI: 10.35490/ec3.2022.155

Ontologies and building digital twins.

Auteurs: Several Authors
Publié dans: Numéro 13, 2022
Éditeur: SPHERE
DOI: 10.5281/zenodo.7681844

Ontologies in digital twin: Methodology, lessons learned and practical approach

Auteurs: Agnieszka Mikołajczyk; Raúl García-Castro; Rahul Tomar; Rehan Khan; Wojciech Teclaw; Bruno Fies; Jonas Schlenger
Publié dans: Crossref, Numéro 16, 2022
Éditeur: Sustainable Places
DOI: 10.12688/openreseurope.15271.1

Recherche de données OpenAIRE...

Une erreur s’est produite lors de la recherche de données OpenAIRE

Aucun résultat disponible