Leistungen
A report which specifies how privacy and ethics will be handled in the Digital Building Twin platform
Requirements Specification for Digital Twin-Supported Progress Monitoring and Quality ControlThis report will be an information delivery manual that will provide the input needed in other WP24 for the information system product and process design
First collection of requests for improvementThis deliverable will evaluate the behaviour of the DBT platform from the point of view of the construction managers end users considering the KPIs identified in WP1 The first version of the platform will be evaluated in month 28 These user feedbacks will be taken into account by tasks WP2 to WP7 to increase DTS and DBT platform quality and improve enduser acceptance
Requirements Analysis and Use Case DefinitionThe deliverable includes Requirements analysis digital occupational health and safety OHS process definition of use cases later tested on construction sites
API Specification for the Digital Twin PlatformThis deliverable is the specification of the API exposed by the Digital Twin PlatformNote an interim version of this report will be delivered and reviewed at M18
Digital Building Twin Requirements analysis and Data modelThis deliverable is a report documenting the technical requirements identified and specifying the developed data models using UML notation and the workflows and processing chains using BPMN notation
Technical requirements specification for equipment optimizationThis report will provide the input from WP6 for the information system design carried out in WP2
Specification of tracking technologiesThe various tracking technologies are compiled and evaluated for the different construction equipment and their use on the construction site This includes the documentation of advantages and disadvantages and possibilities for installation on the construction site or directly on the equipment This will provide a basis for a selection decision
Definition of the digital workflows for the construction processThis deliverable is a comprehensive description of the optimal construction process by means of IDM and BPMN standards clearly specifying actors toolsservices and data exchanges
As-is practices analysis and end-user requirementsA report that will compile the conclusions of the research in the stateoftheart construction processes and formalize the enduser requirements linking them to the pilot cases through a verification matrix
Specification for automated control of construction equipmentThe possibilities for controlling construction equipment are compiled and evaluated Furthermore concepts for providing the recorded information for a control system are documented It is also explained which information must be collected to enable direct controlNote an interim version of this deliverable will be delivered and reviewed at M18
KPIs for evaluating the construction process behaviourThe technical definition of the KPI framework for providing the situational awareness and quantitatively assessing the process performance
Data capture hardware review and selectionThis report will be the specification of the onsite datacapture hardware selection based on the analysis done regarding tools needs price reliability adequacy to the pilot projects etc
Requirements Specification for Simulation and PredictionThis report will provide the input from WP7 for the information system design carried out in WP2
The deliverable (Software + report) includes: Safety domain model, safety rule checking for as-planned safety model (later to be compared against as-is safety model), Process for embedding digital methods in safety planning
This deliverable will provide the indications to manage all research data and metadata explaining how to collect structure share and store the information gathered or raised across the projects lifecycle The DMP will be constantly updated and improved in accordance to all the partners and to the outcomes of the project It will act as a guide both during project development and after project conclusion
A project website will be developed and constantly updated with project progress information and related news It will represent the first touch point with the project consortium for potential stakeholders and an always uptodate showcase for project results
Veröffentlichungen
Autoren:
Timson Yeung; Jhonattan Guillermo Martinez Ribón; Li-Or Sharoni; Rafael Sacks; Tomi Pitkäranta
Veröffentlicht in:
Crossref, Ausgabe 2, 2023
Herausgeber:
IGLC
DOI:
10.24928/2023/0186
Autoren:
Viktor Drobnyi; Yasmin Fathy; Ioannis Brilakis
Veröffentlicht in:
Crossref, Ausgabe 13, 2022
Herausgeber:
UCAM
DOI:
10.35490/ec3.2022.153
Autoren:
Zhiqi Hu; Yasmin Fathy; Ioannis Brilakis
Veröffentlicht in:
Crossref, Ausgabe 13, 2022
Herausgeber:
European Conference on Computing in Construction
DOI:
10.35490/ec3.2022.155
Autoren:
Several Authors
Veröffentlicht in:
Ausgabe 13, 2022
Herausgeber:
SPHERE
DOI:
10.5281/zenodo.7681844
Autoren:
Agnieszka Mikołajczyk; Raúl García-Castro; Rahul Tomar; Rehan Khan; Wojciech Teclaw; Bruno Fies; Jonas Schlenger
Veröffentlicht in:
Crossref, Ausgabe 16, 2022
Herausgeber:
Sustainable Places
DOI:
10.12688/openreseurope.15271.1
Suche nach OpenAIRE-Daten ...
Bei der Suche nach OpenAIRE-Daten ist ein Fehler aufgetreten
Es liegen keine Ergebnisse vor