Skip to main content
Vai all'homepage della Commissione europea (si apre in una nuova finestra)
italiano italiano
CORDIS - Risultati della ricerca dell’UE
CORDIS

BIM2TWIN: Optimal Construction Management & Production Control

CORDIS fornisce collegamenti ai risultati finali pubblici e alle pubblicazioni dei progetti ORIZZONTE.

I link ai risultati e alle pubblicazioni dei progetti del 7° PQ, così come i link ad alcuni tipi di risultati specifici come dataset e software, sono recuperati dinamicamente da .OpenAIRE .

Risultati finali

Report on Privacy & Ethics management (si apre in una nuova finestra)

A report which specifies how privacy and ethics will be handled in the Digital Building Twin platform

Requirements Specification for Digital Twin-Supported Progress Monitoring and Quality Control (si apre in una nuova finestra)

This report will be an information delivery manual that will provide the input needed in other WP24 for the information system product and process design

First collection of requests for improvement (si apre in una nuova finestra)

This deliverable will evaluate the behaviour of the DBT platform from the point of view of the construction managers end users considering the KPIs identified in WP1 The first version of the platform will be evaluated in month 28 These user feedbacks will be taken into account by tasks WP2 to WP7 to increase DTS and DBT platform quality and improve enduser acceptance

Requirements Analysis and Use Case Definition (si apre in una nuova finestra)

The deliverable includes Requirements analysis digital occupational health and safety OHS process definition of use cases later tested on construction sites

Data Capture Report (si apre in una nuova finestra)

Publication-ready report explaining in detail the research and development conducted in Task 2.3. The report will explain the problem addressed, its significance, the state-of-the-art in practice and research leading to a point of departure, the knowledge and development gaps, the objectives and research questions to be addressed, the solutions proposed, the development undertaken, the experiments conducted, the results and their interpretation, and the implications for the industry and society as a whole.

Results of validation tests - Recommended actions for the optimization of equipment on construction sites (si apre in una nuova finestra)

A report on the achievable benefits of the developed methods for the optimization of construction equipment. In addition, the individual test cases are documented in order to provide support for implementation on construction sites.

API Specification for the Digital Twin Platform (si apre in una nuova finestra)

This deliverable is the specification of the API exposed by the Digital Twin PlatformNote an interim version of this report will be delivered and reviewed at M18

Pro-active Digital Twin Construction Process Report (si apre in una nuova finestra)

A report of achievable benefits of predicted performance and its applications, i.e. what are the values obtained? The report also presents a framework for integrating simulation as a standard component of construction company production management.

Digital Building Twin Requirements analysis and Data model (si apre in una nuova finestra)

This deliverable is a report documenting the technical requirements identified and specifying the developed data models using UML notation and the workflows and processing chains using BPMN notation

Object Matching Report (si apre in una nuova finestra)

Publication-ready report explaining in detail the research and development conducted in Task 3.2. The report will explain the problem addressed, its significance, the state-of-the-art in practice and research leading to a point of departure, the knowledge and development gaps, the objectives and research questions to be addressed, the solutions proposed, the development undertaken, the experiments conducted, the results and their interpretation, and the implications for the industry and society as a whole.

Technical requirements specification for equipment optimization (si apre in una nuova finestra)

This report will provide the input from WP6 for the information system design carried out in WP2

Specification of tracking technologies (si apre in una nuova finestra)

The various tracking technologies are compiled and evaluated for the different construction equipment and their use on the construction site This includes the documentation of advantages and disadvantages and possibilities for installation on the construction site or directly on the equipment This will provide a basis for a selection decision

Definition of the digital workflows for the construction process (si apre in una nuova finestra)

This deliverable is a comprehensive description of the optimal construction process by means of IDM and BPMN standards clearly specifying actors toolsservices and data exchanges

Second collection of requests for improvement (si apre in una nuova finestra)

This deliverable will evaluate the behaviour of the DBT platform from the point of view of the construction managers (end users), considering the KPI's identified in WP1. This second version will be evaluated in month 36. These user feedbacks will be taken into account by tasks WP2 to WP7 to increase DTS and DBT platform quality and improve end-user acceptance.

Overall evaluation of the Digital Twin Platform and BIM2TWIN concept (si apre in una nuova finestra)

This deliverable will include the evaluation of the performance and validation of the DBT platform and its methods and concepts in real Demo buildings. This deliverable shall validate the adequation of the DBT solution with S06 after iterative improvements.

As-is practices analysis and end-user requirements (si apre in una nuova finestra)

A report that will compile the conclusions of the research in the stateoftheart construction processes and formalize the enduser requirements linking them to the pilot cases through a verification matrix

Standardization plan (si apre in una nuova finestra)

Synthesis report on the standardisation activities promoting the project outcomes

Specification for automated control of construction equipment (si apre in una nuova finestra)

The possibilities for controlling construction equipment are compiled and evaluated Furthermore concepts for providing the recorded information for a control system are documented It is also explained which information must be collected to enable direct controlNote an interim version of this deliverable will be delivered and reviewed at M18

KPIs for evaluating the construction process behaviour (si apre in una nuova finestra)

The technical definition of the KPI framework for providing the situational awareness and quantitatively assessing the process performance

Data capture hardware review and selection (si apre in una nuova finestra)

This report will be the specification of the onsite datacapture hardware selection based on the analysis done regarding tools needs price reliability adequacy to the pilot projects etc

Lessons Learnt (si apre in una nuova finestra)

This deliverable will be based on the outcomes of the D8.5.2, stressing the results of our project and paving the future for the take-up of DBT.

Requirements Specification for Simulation and Prediction (si apre in una nuova finestra)

This report will provide the input from WP7 for the information system design carried out in WP2

WP3 - Results of validation tests (si apre in una nuova finestra)

A report of achievable benefits of Digital Twin supported progress and quality control and its applications, i.e. what are the values obtained? In addition, the report presents an exploitation study of how to further develop the TRL6 outcomes in conjunction with the broader consortium.

WP4 - Results of validation tests (si apre in una nuova finestra)

This deliverable reports the results of the validation tests and the indication for the Updated versions of the modules. It is the result of Task 4.5.

Digital Twin for Prevention through Design (PtD) (si apre in una nuova finestra)

The deliverable (Software + report) includes: Safety domain model, safety rule checking for as-planned safety model (later to be compared against as-is safety model), Process for embedding digital methods in safety planning

DMP plan (si apre in una nuova finestra)

This deliverable will provide the indications to manage all research data and metadata explaining how to collect structure share and store the information gathered or raised across the projects lifecycle The DMP will be constantly updated and improved in accordance to all the partners and to the outcomes of the project It will act as a guide both during project development and after project conclusion

Project website and visual identity (si apre in una nuova finestra)

A project website will be developed and constantly updated with project progress information and related news It will represent the first touch point with the project consortium for potential stakeholders and an always uptodate showcase for project results

Pubblicazioni

Predictive Simulation for Automated Decision-Support in Production Planning and Control (si apre in una nuova finestra)

Autori: Timson Yeung; Jhonattan Guillermo Martinez Ribón; Li-Or Sharoni; Rafael Sacks; Tomi Pitkäranta
Pubblicato in: Crossref, Numero 2, 2023
Editore: IGLC
DOI: 10.24928/2023/0186

Generating geometric digital twins of buildings: a review (si apre in una nuova finestra)

Autori: Viktor Drobnyi; Yasmin Fathy; Ioannis Brilakis
Pubblicato in: Crossref, Numero 13, 2022
Editore: UCAM
DOI: 10.35490/ec3.2022.153

Geometry updating for digital twins of buildings: a review to derive a new geometry-based object class hierarchy (si apre in una nuova finestra)

Autori: Zhiqi Hu; Yasmin Fathy; Ioannis Brilakis
Pubblicato in: Crossref, Numero 13, 2022
Editore: European Conference on Computing in Construction
DOI: 10.35490/ec3.2022.155

Ontologies and building digital twins. (si apre in una nuova finestra)

Autori: Several Authors
Pubblicato in: Numero 13, 2022
Editore: SPHERE
DOI: 10.5281/zenodo.7681844

Ontologies in digital twin: Methodology, lessons learned and practical approach (si apre in una nuova finestra)

Autori: Agnieszka Mikołajczyk; Raúl García-Castro; Rahul Tomar; Rehan Khan; Wojciech Teclaw; Bruno Fies; Jonas Schlenger
Pubblicato in: Crossref, Numero 16, 2022
Editore: Sustainable Places
DOI: 10.12688/openreseurope.15271.1

È in corso la ricerca di dati su OpenAIRE...

Si è verificato un errore durante la ricerca dei dati su OpenAIRE

Nessun risultato disponibile

Il mio fascicolo 0 0