Skip to main content
European Commission logo
français français
CORDIS - Résultats de la recherche de l’UE
CORDIS
Contenu archivé le 2024-04-16

INTEGRATED PRODUCTION CELL FOR THE STEEL COMPONENTS OF REINFORCED CONCRETE BUILDING ELEMENTS

Objectif


The project has generated the following results:

- A pilot plant, in the reinforcement workshop of Spanbeton B.V. which operates as an integrated production cell. The pilot plant exhibits an overall 40% improvement in productivity.

- The application of a six-axis industrial robot to the assembly (i.e welding) of 2D and 3D reinforcement components.

- A 2D stirrup assembly machine.

- A 'sandwich' machine for the production of 3D mesh panels, consisting of a slab of insulation sandwiched between two meshes.

- A flexible 2D mesh welding machine.

- Control software for the management of a reinforcement workshop as an integrated production cell.

- Communication software for the interface between the control software and machines in a reinforcement production cell.

Thème(s)

Data not available

Appel à propositions

Data not available

Régime de financement

Data not available

Coordinateur

Ergon SA
Contribution de l’UE
Aucune donnée
Adresse
Petrou Ralli Avenue 19
17778 ATHINAI
Grèce

Voir sur la carte

Coût total
Aucune donnée

Participants (4)