Skip to main content
European Commission logo
English English
CORDIS - EU research results
CORDIS
Content archived on 2024-04-16

INTEGRATED PRODUCTION CELL FOR THE STEEL COMPONENTS OF REINFORCED CONCRETE BUILDING ELEMENTS

Objective


The project has generated the following results:

- A pilot plant, in the reinforcement workshop of Spanbeton B.V. which operates as an integrated production cell. The pilot plant exhibits an overall 40% improvement in productivity.

- The application of a six-axis industrial robot to the assembly (i.e welding) of 2D and 3D reinforcement components.

- A 2D stirrup assembly machine.

- A 'sandwich' machine for the production of 3D mesh panels, consisting of a slab of insulation sandwiched between two meshes.

- A flexible 2D mesh welding machine.

- Control software for the management of a reinforcement workshop as an integrated production cell.

- Communication software for the interface between the control software and machines in a reinforcement production cell.

Topic(s)

Data not available

Call for proposal

Data not available

Funding Scheme

Data not available

Coordinator

Ergon SA
EU contribution
No data
Address
Petrou Ralli Avenue 19
17778 ATHINAI
Greece

See on map

Total cost
No data

Participants (4)