INTEGRATED PRODUCTION CELL FOR THE STEEL COMPONENTS OF REINFORCED CONCRETE BUILDING ELEMENTS

Objective


The project has generated the following results:

- A pilot plant, in the reinforcement workshop of Spanbeton B.V. which operates as an integrated production cell. The pilot plant exhibits an overall 40% improvement in productivity.

- The application of a six-axis industrial robot to the assembly (i.e welding) of 2D and 3D reinforcement components.

- A 2D stirrup assembly machine.

- A 'sandwich' machine for the production of 3D mesh panels, consisting of a slab of insulation sandwiched between two meshes.

- A flexible 2D mesh welding machine.

- Control software for the management of a reinforcement workshop as an integrated production cell.

- Communication software for the interface between the control software and machines in a reinforcement production cell.

Coordinator

Ergon SA
Address
Petrou Ralli Avenue 19
17778 Athinai
Greece

Participants (4)

British Maritime Technology Ltd
United Kingdom
Address
Waldegrave Road 1
TW11 8LZ Teddington, Middlesex
House SA
Greece
Address
N. Charitou Street 41
43100 Karditsa
Logabex
France
Address
20 Avenue Didier Daurat
31400 Toulouse
Schokbeton BV
Netherlands
Address
Lindtsedijk 14
3336 LE Zwijndrecht