Skip to main content
European Commission logo
polski polski
CORDIS - Wyniki badań wspieranych przez UE
CORDIS
Zawartość zarchiwizowana w dniu 2024-04-16

INTEGRATED PRODUCTION CELL FOR THE STEEL COMPONENTS OF REINFORCED CONCRETE BUILDING ELEMENTS

Cel


The project has generated the following results:

- A pilot plant, in the reinforcement workshop of Spanbeton B.V. which operates as an integrated production cell. The pilot plant exhibits an overall 40% improvement in productivity.

- The application of a six-axis industrial robot to the assembly (i.e welding) of 2D and 3D reinforcement components.

- A 2D stirrup assembly machine.

- A 'sandwich' machine for the production of 3D mesh panels, consisting of a slab of insulation sandwiched between two meshes.

- A flexible 2D mesh welding machine.

- Control software for the management of a reinforcement workshop as an integrated production cell.

- Communication software for the interface between the control software and machines in a reinforcement production cell.

Temat(-y)

Data not available

Zaproszenie do składania wniosków

Data not available

System finansowania

Data not available

Koordynator

Ergon SA
Wkład UE
Brak danych
Adres
Petrou Ralli Avenue 19
17778 ATHINAI
Grecja

Zobacz na mapie

Koszt całkowity
Brak danych

Uczestnicy (4)