Obiettivo TO EVALUATE EXISTING METHODS AND TO DEVELOP AND TEST NEW METHODS AND THEORIES FOR MODELLING GROUND WATER POLLUTION FROM WASTE DISPOSAL SITES. THE PROPOSED PROJECT IS DIVIDED INTO TWO PHASES WITH A DURATION OF EIGHT MONTHS AND THREE YEARS RESPECTIVELY. THE PRESENT PROPOSAL APPLIES TO THE FIRST PHASE ALONE. UPON COMPLETION OF THIS PHASE AN APPLICATION OF THE FOLLOWING AND MORE COMPREHENSIVE PHASE WILL BE SUBMITTED. PHASE I INCLUDES THE FOLLOWING ACTIVITIES: 1) SELECTION OF SUITABLE DISPOSAL SITES FOR THE PROJECT ON THE BASIS OF A THOROUGH ANALYSIS OF POSSIBLE DISPOSAL SITES, TWO SITES WILL BE SELECTED FOR THE PROJECT. THE SITES SHOULD BE TYPICAL IN TERMS OF HYDROGEOLOGICAL CONDITIONS AND WASTE COMPOSITION, AND FURTHER THEY SHOULD NOT THREATEN LARGER WATER SUPPLY WELLS THUS REQUIRING EXTENSIVE REMEDIAL ACTIONS DURING PROJECT PERIOD. THIS ACTIVITY WILL FURTHER INCLUDE INVESTIGATIONS OF THE HISTORY AND THE PRESENT STATE OF THE SITES IN ORDER TO ASSESS THE LEACHATE FORMATION. 2) DATA COLLECTION, MATHEMATICAL MODELLING AND SUPPLEMENTARY FIELD INVESTIGATIONS ALL EXISTING DATA WILL BE COLLECTED AND EVALUATED. ON THIS BASIS PRELIMINARY ASSESSMENTS OF THE HYDROGEOLOGICAL AND CHEMICAL CONDITIONS WILL BE MADE. CALIBRATION AND APPLICATION OF NUMERICAL CONTAMINANT TRANSPORT MODELS. CALCULATIONS WILL BE CARRIED OUT WITH THE OBJECTIVES OF PREDICTING CONTAMINANT PLUME MIGRATION AND IDENTIFYING THE SUPPLEMENTARY FIELD INVESTIGATIONS. THESE INCLUDE A FEW WELL BORINGS AND WATER QUALITY ANALYSES. 3) PLANNING OF DETAILED PROGRAMMES FOR PHASE II ON THE BASIS OF THE ANALYSES AND MODEL SIMULATIONS DESCRIBED ABOVE A DETAILED PROGRAMME WILL BE PLANNED FOR PHASE II OF THE PROJECT, WHICH INCLUDES THE MAIN BULK OF THE PROJECT. THIS PHASE WILL COMPRISE COMPREHENSIVE FIELD INVESTIGATIONS AS WELL AS A RESEARCH PROGRAMME OF INTERDISCIPLINARY NATURE. Programma(i) PRE-ENVPROT 3C - Sectoral research and development programme (EEC) in the field of environment (environmental protection and climatology) - indirect and concerted actions - Environmental protection -, 1981-1985 Argomento(i) Data not available Invito a presentare proposte Data not available Meccanismo di finanziamento CSC - Cost-sharing contracts Coordinatore Dansk Hydraulisk Institut Contributo UE Nessun dato Indirizzo 5,Agern Allé 2970 Hørsholm Danimarca Mostra sulla mappa Costo totale Nessun dato