STABILISATION OF UNCONSOLIDATED BACKFILL

Obiettivo

To investigate the technical and economical feasibility of stabilizing unconsolidated backfill. Methods such as grouting or freezing will be used. Design methods will be developed and suitable methods and materials will be tested both in the laboratory and in full scale field trials.

The unconsolidated backfill, comprising deslimed mill tailings or other granular materials, was widely used in the past in order to stabilize underground mine openings. Stabilization of this material would permit the extraction of adjacent ore in pillars with minimal loss of dilution, giving a significant economic gain from the increased recovery rate expected.

It is intended to investigate techniques for the stabilization of unconsolidated backfill and estimate the associated costs and benefits. Techniques considered will include grouting, freezing and other stabilization methods. An outside specialist in such techniques will be consulted and will evaluate the initial testwork proposals.

The partners will assess and develop methods of designing the strengths required to prevent failure of stabilized fill when exposed by adjacent mining. Numerical modelling techniques such as finite element and finite difference methods will be included in this assessment. A specifically tailored design method will be developed by Mining Italiana for use at Tara Mines.

Using the design method developed, the material strengths and extent of stabilization required for a full scale field trial will be determined.

Laboratory compressive and shear tests will be used to determine the most economic method of achieving the required strengths. The constitutive parameters of the stabilized materials (moduli, Poissons Ratio) will also be determined for input to the numerical models.

The monitoring and sampling methods required for a full scale field trial will be determined.

The partners will plan a full scale field trial using the most appropriate techniques and materials as determined previously.

Tara Mines, with cooperation from Mining Italiana, will conduct the full scale field trial and monitor the performance of the stabilized fill during adjacent mining, using the methods already developed.

The data obtained from the field trial will be analyzed and the developed design model calibrated.

Conclusions and final report will be produced.

Campo scientifico (EuroSciVoc)

CORDIS classifica i progetti con EuroSciVoc, una tassonomia multilingue dei campi scientifici, attraverso un processo semi-automatico basato su tecniche NLP. Cfr.: Il Vocabolario Scientifico Europeo.

È necessario effettuare l’accesso o registrarsi per utilizzare questa funzione

Programma(i)

Programmi di finanziamento pluriennali che definiscono le priorità dell’UE in materia di ricerca e innovazione.

Argomento(i)

Gli inviti a presentare proposte sono suddivisi per argomenti. Un argomento definisce un’area o un tema specifico per il quale i candidati possono presentare proposte. La descrizione di un argomento comprende il suo ambito specifico e l’impatto previsto del progetto finanziato.

Dati non disponibili

Invito a presentare proposte

Procedura per invitare i candidati a presentare proposte di progetti, con l’obiettivo di ricevere finanziamenti dall’UE.

Dati non disponibili

Meccanismo di finanziamento

Meccanismo di finanziamento (o «Tipo di azione») all’interno di un programma con caratteristiche comuni. Specifica: l’ambito di ciò che viene finanziato; il tasso di rimborso; i criteri di valutazione specifici per qualificarsi per il finanziamento; l’uso di forme semplificate di costi come gli importi forfettari.

CSC - Cost-sharing contracts

Coordinatore

Mining Italiana SpA
Contributo UE
Nessun dato
Indirizzo
Via Chianesi 110
00128 Roma
Italia

Mostra sulla mappa

Costo totale

I costi totali sostenuti dall’organizzazione per partecipare al progetto, compresi i costi diretti e indiretti. Questo importo è un sottoinsieme del bilancio complessivo del progetto.

Nessun dato

Partecipanti (1)

Il mio fascicolo 0 0