RELIABILITY BASED INSPECTION SCHEDULING FOR FIXED OFFSHORE PLATFORMS

Obiettivo

The aim of the project is to provide a rational methodology for scheduling of inspection of fixed offshore platforms based on reliability techniques which will result in :
. Improved safety of fixed offshore installations
. Increased effectiveness of subsea work by eliminating unnecessary repairs
and targeting maintenance.
. Enhancement of operating life of the structure by concentrating resources
on critical problem areas.
. Implementation of the developed methodology for a typical fixed platform to
assess the benefits.
The main ocnclusions and achievements of the project are :
1. The reliability analysis methods developed within another European Research programme (BRITE-P2124) have been integrated with validated fracture mechanics models. This has led to accurate modelling of the fatigue crack deterioration process.
2. The reliability analysis programs provide expected cost of inspection, repair and failure in addition to reliability index. This has resulted in a system which allows alternative inspection, maintenance and repair plants to be compared.
3. A module for fatigue crack growth calculations in tubular joints using fracture mechanics was developed.
4. A methodology and module have been developed for providing fatigue loads for reliability calculations.
5. Corrosion fatigue crack growth material properties are required for accurate reliability analysis. An existing corrosion fatigue crack growth database of experimental results was analysed to provide a high level database.
6. The performance of parametric equations was assessed by comparing predicted results with experimental data. From this, recommendations for bias factors have been provided.
7. The inspection reliability data (POD) is normally expressed in terms of crack length. However, for the purposes of fracture mechanics analysis the POD expressed in terms of depth is required. The data for four commonly used NDT methods was re-analysed and POD was expressed in terms of depth.
8. A prototype knowledge based system which can schedule based on reliability index was produced.
9. Knowledge based systems for ranking, scheduling and system control have been developed.
10. A full user interface specification and design has been produced.
11. Validation of database and analysis modules has been performed.
12. Validation of the analysis system using a sample platform structure was carried out.
In order to apply the system in practice, the following work is required :
1. Integrate modules with operators' information systems to provide the RISC system with all the necessary information.
2. Develop user interfaces.
3. Develop modules for automating and interfacing to external analysis modules. In particular, interfaces are required with finite element systems.
4. Carry out calibration studies to gain experience of the overall methodology and to obtain acceptance by Certification Authorities, legal bodies etc.
The above tasks could be carried out as part of a RISC User Group activity or on a case-by-case basis for individual operators.
The development of inspection strategies for offshore structural integrity should be done within a framework giving advanced reliability analysis and utilising a knowledge base approach. It incorporates the latest developments in modelling and the appropriate databases. Finally, a reduction in uncertainty can be obtained by introducing a higher quality of data input through the use of on-line monitoring.
The modelling of the effects of the environment on the structure and the evaluation of inspection results requires up-to-date databases for materials, analysis methods and inspection techniques. In this project suitable database structures have been defined and some sample data provided.
Structural integrity assessment is based on fracture mechanics crack growth analysis.
The physical modelling includes the loading history, stress analysis fracture mechanics calculation of stress intensity factors and the materials response (crack growth data).
The Knowledge Based System for ranking, scheduling and system control will provide an overall framework for RISC.

Campo scientifico (EuroSciVoc)

CORDIS classifica i progetti con EuroSciVoc, una tassonomia multilingue dei campi scientifici, attraverso un processo semi-automatico basato su tecniche NLP. Cfr.: Il Vocabolario Scientifico Europeo.

Questo progetto non è ancora stato classificato con EuroSciVoc.
Suggerisci i campi scientifici che ritieni più rilevanti e aiutaci a migliorare il nostro servizio di classificazione.

È necessario effettuare l’accesso o registrarsi per utilizzare questa funzione

Programma(i)

Programmi di finanziamento pluriennali che definiscono le priorità dell’UE in materia di ricerca e innovazione.

Argomento(i)

Gli inviti a presentare proposte sono suddivisi per argomenti. Un argomento definisce un’area o un tema specifico per il quale i candidati possono presentare proposte. La descrizione di un argomento comprende il suo ambito specifico e l’impatto previsto del progetto finanziato.

Invito a presentare proposte

Procedura per invitare i candidati a presentare proposte di progetti, con l’obiettivo di ricevere finanziamenti dall’UE.

Dati non disponibili

Meccanismo di finanziamento

Meccanismo di finanziamento (o «Tipo di azione») all’interno di un programma con caratteristiche comuni. Specifica: l’ambito di ciò che viene finanziato; il tasso di rimborso; i criteri di valutazione specifici per qualificarsi per il finanziamento; l’uso di forme semplificate di costi come gli importi forfettari.

DEM - Demonstration contracts

Coordinatore

Technical Software Consultants Ltd
Contributo UE
Nessun dato
Indirizzo
6 Mill Square Featherstone Road Wolverton Mill
MK12 5RB Milton Keynes
Regno Unito

Mostra sulla mappa

Costo totale

I costi totali sostenuti dall’organizzazione per partecipare al progetto, compresi i costi diretti e indiretti. Questo importo è un sottoinsieme del bilancio complessivo del progetto.

Nessun dato
Il mio fascicolo 0 0