Skip to main content
Vai all'homepage della Commissione europea (si apre in una nuova finestra)
italiano it
CORDIS - Risultati della ricerca dell’UE
CORDIS
Contenuto archiviato il 2022-12-27

DEVELOPMENT OF KEY SYSTEMS FOR OFFSHORE SUBMARINES [PHASE 2]

Obiettivo

The overall aim of the project is to further pursue the development of the key systems of offshore submarines begun in Phase I (TH. 07062/86) in order to attain the level of proven technology.
By extensive testing of those systems which are not standard technology on test rigs and in a submarine in real operations, it is intended to obtain sufficient data to gain acceptance from potential users and to qualify the submarine for subsea work.
See projects TH./07062/86 and OG./00064/91.
The technical objectives of this part project with respect to :
- increase in specific power output or conversely decrease in space requirements per unit power
- improvement of the system efficiency
- reduction in noise level
- improved reliability and higher endurance were achieved. The test rig achieved a power output in excess of 450 kWe.
LIFE SUPPORT SYSTEM
After some initial problems with the behaviour of the amine granules in the absorption beds, the test CO2 control system performed satisfactorily. It achieved 94% of the design rating of 220 l/h (CO2 removal) for a submarine crew of 11 persons at atmospheric conditions of 17 deg. C and 40 % r.h.
Endurance tests were not performed during the current Phase; these are planned for Phase III.
The project covers the engineering, construction and testing of the systems mentioned below. The programme also includes the engineering for the installation of the test rigs in a submarine.
It is planned to install the plant in a existing submarine and test the systems in real subsea operations in a subsequent Phase III.
ENERGY SYSTEM
Based on the experience gained on the test rig built in Phase I, a new and improved closed cycle diesel engine of 150 kW will be engineered and built.
The improvements are expected to achieve the following :
(1) Increase in the specific power output. (2) Improvement of the system efficiency. (3) Reduction in noise level. (4) Higher endurance.
After extensive testing of the new closed cycle diesel on the test rig, it is planned to install the plant on a submarine for trials at sea. The engineering for the installation is part of the current project.
LIFE SUPPORT SYSTEM
During Phase I a concept for the regenerative CO2 absorption system was established. In the present project a full scale test plant for a full submarine crew is to be engineered, built and tested on a land based rig. Later the equipment will be tested together with the energy system on a submarine in a planned Phase III.

Campo scientifico (EuroSciVoc)

CORDIS classifica i progetti con EuroSciVoc, una tassonomia multilingue dei campi scientifici, attraverso un processo semi-automatico basato su tecniche NLP. Cfr.: Il Vocabolario Scientifico Europeo.

Questo progetto non è ancora stato classificato con EuroSciVoc.
Suggerisci i campi scientifici che ritieni più rilevanti e aiutaci a migliorare il nostro servizio di classificazione.

È necessario effettuare l’accesso o registrarsi per utilizzare questa funzione

Programma(i)

Programmi di finanziamento pluriennali che definiscono le priorità dell’UE in materia di ricerca e innovazione.

Argomento(i)

Gli inviti a presentare proposte sono suddivisi per argomenti. Un argomento definisce un’area o un tema specifico per il quale i candidati possono presentare proposte. La descrizione di un argomento comprende il suo ambito specifico e l’impatto previsto del progetto finanziato.

Invito a presentare proposte

Procedura per invitare i candidati a presentare proposte di progetti, con l’obiettivo di ricevere finanziamenti dall’UE.

Dati non disponibili

Meccanismo di finanziamento

Meccanismo di finanziamento (o «Tipo di azione») all’interno di un programma con caratteristiche comuni. Specifica: l’ambito di ciò che viene finanziato; il tasso di rimborso; i criteri di valutazione specifici per qualificarsi per il finanziamento; l’uso di forme semplificate di costi come gli importi forfettari.

DEM - Demonstration contracts

Coordinatore

THYSSEN NORDSEEWERKE GMBH
Contributo UE
Nessun dato
Indirizzo
ZUM ZUNGENKAI
26703 EMDEN
Germania

Mostra sulla mappa

Costo totale

I costi totali sostenuti dall’organizzazione per partecipare al progetto, compresi i costi diretti e indiretti. Questo importo è un sottoinsieme del bilancio complessivo del progetto.

Nessun dato
Il mio fascicolo 0 0