Leistungen
Roadmap for communication and dissemination activities ALS Delivered M3
D4.1.B Dissemination plan - publicDetailed dissemination strategy ALS Delivered M3
D2.1. Level 2 test plan proposal (M5)Level 2 test plan proposal It contains the detailed information to be tested in Level2 Test type material configuration tooling needs predicted failure loads and failure modes number of specimen to be tested test sequence etc
D3.1.Level 3 test plan proposalLevel 3 test plan proposal It contains the detailed information to be tested in Level3 Test tooling predicted failure loads and failure modes number test sequence etc
General Data Management Plan GDMP will be defined at the beginning of the project including what types of data will the project generatecollect how the consortium will manage the data generated andor collected during the project what standards will be used how will this data be exploited andor sharedmade accessible for verification and reuse if applicable
Suche nach OpenAIRE-Daten ...
Bei der Suche nach OpenAIRE-Daten ist ein Fehler aufgetreten
Es liegen keine Ergebnisse vor