PSM concept of operations 1
(öffnet in neuem Fenster)
The consolidated material from the work performed so far will form the initial version of the PSM ConOps document
Part 1 of D2
(öffnet in neuem Fenster)
D10 will be the input of Task 1 to D2Definition of highlevel specifications and requirements for system installationsetup and methodologies for feedback and data collection
Dissemination and Exploitation Plan
(öffnet in neuem Fenster)
The Dissemination and Exploitation Plan will lay down the planned DE activities including the link to the respective technical work packages
High Level Specifications and Requirements
(öffnet in neuem Fenster)
Output of Task 1 D10 Definition of highlevel specifications and requirements for system installationsetup and methodologies for feedback and data collectionOutput of Task 2Input of methodologies for feedback and data collection including oPilot Preparation PaperoPilot QuestionnaireoInterrogation Guidance Paper
PSM usability feedback
(öffnet in neuem Fenster)
PSM Concept of Operations Phase 1The consolidated material will form the initial version of the PSM ConOps document
Final evaluation / Acceptance analysis update
(öffnet in neuem Fenster)
The report will contain the final results of the acceptance analysis with the related main feedback and recommendations and the main conclusions from the project