WP1
– Established operation of all project bodies,
- ensured quality of project work and its results as well as self-assessment and project monitoring, including risk management
- organized project administration, supervision of financial flows and communication
WP2
- Created a definition of Network Application and scope of services available from the 5GASP reference architecture
- Created initial definitions of the rest of the entities, their scope and role in the overall application architecture, services provided and high-level description of interfaces for coordination
- Provided capabilities and requirements of all participating NetApps and testbeds
- Created reference and base understanding of scope and entities of 5GASP certification pipeline, to be used in individual WP for implementation and further design
WP3
Delivered he 5GASP NetApp Onboarding and Deployment Services (NODS) requirements, consisting of the onboarding and deployment input model, the actors of the Services and the facing aspects and requirements extracted from the list of actors as well as the internal architecture of NODS is introduced along with its constituent internal services, followed by the standardized northbound interfaces that are eventually exposed.
7
- Delivered and deployed the NODS experimentation service for architecture validation and the fulfilment of the previously extracted requirements. NODS supports the onboarding process of the NetApps as well as the full CI/CD cycle.
- Studied the conditions to be met to address the facility sites interconnection into a multi- domain NFV/SDN fabric, along with its implementation proposal and the security aspects emerged as well as the implementation capabilities to be met by each component of the multi-domain fabric, i.e. testbeds, so as to address the specific needs of the vertical use cases.
- Delivered the interdomain connectivity between the 5GASP test sites. The 5GASP multi- domain NFV fabric is designed to allow secure deployment of Network Services across the testbeds.
- Deployed Enhanced Mobile Broadband (eMBB) network slices at all the 5GASP testbeds from the NODS portal
- Studied the technical requirements of the NetApps and the ability of the testbeds to support the NetApp(s) deployment
WP4
- A methodology to produce NetApps has been defined: the 5GASP methodology. It defines how 5GASP SME partners solutions will be defined, modelled, designed and implemented to compound a NetApp ready to be automated, able to follow the CI/CD process and be testable.
- The NetApps of the consortium are applying the methodology and they are at different levels of VNFication, being the majority of them in the latest stages of NetApp development and some of them already in deployment and testing stages.
- The initial design of NetApps in the Automotive and PPDR Verticals has been presented in D4.3.
- Inputs for WP5 have been provided in the form of the NetApp test plan, initial test definitions and testing needs, and for WP3, with the NetApp hardware requirements from testbeds.
WP5
- Definition of the NFV Model Test Plan
- Design & Development of the Validation Service
- Development of pre-defined tests
- Initial version of the process and tools used for the Certification Process.
WP6
- Developing both portals’ beta versions (community.5gasp.eu and store.5gasp.eu).
- Proceeding with delivering and making publicly available NetAppCommunity portal final version.
- Defining the initial design plan for the 5GASP-C process and its sub-processes.
- 5GASP Community Engagement Events: 3 online webinars and a NetAppLab event with hybrid online and physical presence.
WP7
- Website and project branding
- Data management plan creation
- Market research
- IPR management
- Dissemination activities (scientific publications, major conferences participation, press
releases, industrial fora related activities, social media, etc.)