Resultado final
This report will include an assessment of the modal shift potential and the potential for increase of market shares and new market segments based on Task 71
Report on the impact evaluation of ETCS L3 enabled by DAC on traffic and operational performances including the framework conditions needed for successful implementation (se abrirá en una nueva ventana)The public document will outline the impact evaluation of ETCS L3 on traffic and operational performances Further it will include the framework conditions that are needed for a successful implementation and is based on Tasks 61 and 62
Final recommendations including best migration scenario, best point in time for migration in main system, measures needed and minimum requirements/criteria to ensure migration feasibility (se abrirá en una nueva ventana)Final report on recommendations concerning migration strategies migration in main system as well as measures and requirements to ensure migration feasibility summarizing the results of Task 4145
Report on Dissemination and Promotion and Stakeholder Activities (se abrirá en una nueva ventana)This document will describe the dissemination and promotion activities as well as the performed stakeholder activities during the project execution
Dissemination Plan (se abrirá en una nueva ventana)Planned dissemination activities and key events for the project
Project handbook and quality plan (se abrirá en una nueva ventana)This Public deliverable will address adopted procedures (including guidelines, templates, deliverables and milestones) for handling documents (document numbering, classification and status of documents etc.). Special attention will be placed on the quality check of the technical deliverables and documents submitted to the S2R JU and data management plan (access rights to info inside / outside the consortium). Templates will be based on the S2R Handbook e.g. deliverable, periodic report.
Report on Acceptability, Attractiveness and Work Safety (se abrirá en una nueva ventana)The report will includemapping of the impact of DAC on job profiles recommendations guidelines and challenges
Requirement Specifications and Operational Rules (se abrirá en una nueva ventana)The report will includeHarmonized DAC Specification including electricalcommunication DAC Reference System Architectures Future operational processes and procedures with a DAC Input for standardisation
Draft Requirement Specifications and Operational Rules (se abrirá en una nueva ventana)First draft of the Requirement Specifications and Operational Rules The report will includeDraft Harmonized DAC Specification including electricalcommunication Task 31Draft DAC Reference System Architectures Task 32Draft Future operational processes and procedures with a DAC Task 33
Publicaciones
Autores:
B. Djordjevic, B. Kordnejad, I. Nordmark, G. Troche, J. Bergstrand
Publicado en:
2023
Editor:
RailEngineering 2023
Autores:
Valeria Bagliano (RINA Consulting), Stefan Witte (OWITA), Roland Hess (OWITA), Stefan Hagenlocher (hwh) and Christian Schwarzl, Bernhard Winkler und Peter Perstel (ViF)
Publicado en:
2023
Editor:
https://www.v2c2.at/daccelerate/