Accelerated DAC transformation to full digital rail freight operations in Europe

Leistungen

Modal Shift and socio-environmental impact

This report will include an assessment of the modal shift potential and the potential for increase of market shares and new market segments based on Task 71

Report on the impact evaluation of ETCS L3 enabled by DAC on traffic and operational performances including the framework conditions needed for successful implementation

The public document will outline the impact evaluation of ETCS L3 on traffic and operational performances Further it will include the framework conditions that are needed for a successful implementation and is based on Tasks 61 and 62

Final recommendations including best migration scenario, best point in time for migration in main system, measures needed and minimum requirements/criteria to ensure migration feasibility

Final report on recommendations concerning migration strategies migration in main system as well as measures and requirements to ensure migration feasibility summarizing the results of Task 4145

Report on Dissemination and Promotion and Stakeholder Activities

This document will describe the dissemination and promotion activities as well as the performed stakeholder activities during the project execution

Dissemination Plan

Planned dissemination activities and key events for the project

Project handbook and quality plan

This Public deliverable will address adopted procedures (including guidelines, templates, deliverables and milestones) for handling documents (document numbering, classification and status of documents etc.). Special attention will be placed on the quality check of the technical deliverables and documents submitted to the S2R JU and data management plan (access rights to info inside / outside the consortium). Templates will be based on the S2R Handbook e.g. deliverable, periodic report.

Report on Acceptability, Attractiveness and Work Safety

The report will includemapping of the impact of DAC on job profiles recommendations guidelines and challenges

Requirement Specifications and Operational Rules

The report will includeHarmonized DAC Specification including electricalcommunication DAC Reference System Architectures Future operational processes and procedures with a DAC Input for standardisation

Draft Requirement Specifications and Operational Rules

First draft of the Requirement Specifications and Operational Rules The report will includeDraft Harmonized DAC Specification including electricalcommunication Task 31Draft DAC Reference System Architectures Task 32Draft Future operational processes and procedures with a DAC Task 33

Veröffentlichungen

“Potential Productivity gains from longer Trains with Introduction of DAC”

Autoren: B. Djordjevic, B. Kordnejad, I. Nordmark, G. Troche, J. Bergstrand
Veröffentlicht in: 2023
Herausgeber: RailEngineering 2023

Shift2Rail project “DACcelerate” – Digital Automatic Couplinf for Rail Freight Transportation in Europe

Autoren: Valeria Bagliano (RINA Consulting), Stefan Witte (OWITA), Roland Hess (OWITA), Stefan Hagenlocher (hwh) and Christian Schwarzl, Bernhard Winkler und Peter Perstel (ViF)
Veröffentlicht in: 2023
Herausgeber: https://www.v2c2.at/daccelerate/