Leistungen
First version on the dissemination activities and communication channels and material for the project for year 1, as part of T9.2.
Project Website and Social Media campaignReport on the project website development and social media presence and activities, as part of T9.2.
An analysis (building upon pilot survey results to be generated in T1.3), detailing the different targets of the foreseen renovation activities so as to design relevant use-case scenarios.
EU Regulations, Buildings Types and InstallationsAn analysis of current standards and national legislation related to building renovation procedures, building upon outcomes of T1.1.
Interoperable specifications of APIs and data modelsA report detailing common APIs and data models, to be applied to ensure the efficient data exchange among devices, building systems, data platforms, products, applications, services and operations, building upon outcomes of T3.1.
How to boost district renovation in Positive Energy DistrictsAnalysis of business-as-usual models and identification of potential paths for improvements towards boosting renovation (linked with T8.1)
User and system requirements and InCUBE architecture (v1)Definition of InCUBE technical architecture and detailed guidelines for the seamless integration of different components, including an evaluation of the System Readiness Level and Integration Readiness Level; capitalizing works to be conducted in T1.5.
InCUBE Evaluation Framework and KPI Repository (v1)A repository of tailored metrics and key performance indicators (KPIs), to be defined in T1.4, that can guide the holistic evaluation of InCUBE activities.
Stakeholders Requirements and Market Needs Definition (v1)An analysis of technical, financial, environmental and societal requirements, addressing stakeholders’ needs, as defined in T1.2.
Pilot Planning and Setup (v1)Report describing the pilot methodology plans, necessary steps-clearances and implementation timeline for each site, as described in T7.1.
Development of InCUBE’s BIM modelling framework including SCAN-to-BIM and BIM/CIM platform advancements, as defined in T3.2, and the creation of all necessary BIM/CIM models.
Data Management Plan (DMP) (v1)Detailed data management plan as well as ethics management in the project lifetime. It will also encapsulate open access to research data.
Veröffentlichungen
Autoren:
Komninos Angelakoglou; Eleni Chatzigeorgiou; Ioannis Lampropoulos; Paraskevi Giourka; Georgios Martinopoulos; Nikolaos Nikolopoulos
Veröffentlicht in:
Buildings, Ausgabe Volume 13; Ausgabe 8, 2023, ISSN 2075-5309
Herausgeber:
MDPI
DOI:
10.3390/buildings13082046
Autoren:
Angeliki Kitsopoulou; Antonis Zacharis; Nikolaos Ziozas; Evangelos Bellos; Petros Iliadis; Ioannis Lampropoulos; Eleni Chatzigeorgiou; Komninos Angelakoglou; Nikolaos Nikolopoulos
Veröffentlicht in:
Sustainability, Ausgabe Volume 15; Ausgabe 14, 2023, ISSN 2071-1050
Herausgeber:
MDPI Open Access Publishing
DOI:
10.3390/su151411054
Autoren:
Apostolopoulos, Vasilis, Ioannis Mamounakis, Andreas Seitaridis, Nikolas Tagkoulis, Dimitrios-Sotirios Kourkoumpas, Petros Iliadis, Komninos Angelakoglou, and Nikolaos Nikolopoulos
Veröffentlicht in:
Applied Energy, Ausgabe Volume 334, 2023, ISSN 0306-2619
Herausgeber:
Pergamon Press Ltd.
DOI:
10.1016/j.apenergy.2023.120710
Autoren:
O. Roman, E. M. Farella, S. Rigon, F. Remondino, S. Ricciuti, and D. Viesi
Veröffentlicht in:
The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, Ausgabe Volume XLVIII-1/W3-2023, 2023, ISSN 2194-9034
Herausgeber:
The International Society for Photogrammetry and Remote Sensing
DOI:
10.5194/isprs-archives-xlviii-1-w3-2023-175-2023
Suche nach OpenAIRE-Daten ...
Bei der Suche nach OpenAIRE-Daten ist ein Fehler aufgetreten
Es liegen keine Ergebnisse vor