Skip to main content
Vai all'homepage della Commissione europea (si apre in una nuova finestra)
italiano italiano
CORDIS - Risultati della ricerca dell’UE
CORDIS

Plug&plAy eneRgy ManagEmeNt for hybrID Energy Storage

CORDIS fornisce collegamenti ai risultati finali pubblici e alle pubblicazioni dei progetti ORIZZONTE.

I link ai risultati e alle pubblicazioni dei progetti del 7° PQ, così come i link ad alcuni tipi di risultati specifici come dataset e software, sono recuperati dinamicamente da .OpenAIRE .

Risultati finali

Plan for Dissemination, Communication and Networking of the Results (PDCR) (si apre in una nuova finestra)

Produced by tasks T6.1, T6.2Detailled plan for Dissemination, Communication and Networking of the Results (PDCR), including visual identity of the project, plans for project ommunication and dissemination and corresponding channels, and plans for networking activities including BRIDGE, InterConnect, and Partnership 2Zero. The initial version of the document will be available at M6 and continously updated.

PARMENIDES system architecture (si apre in una nuova finestra)

Produced by task T3.1Definition of the generic PARMENIDES architecture (as well as pilot-specific instantiations), using the SGAM (Smart Grid Architecture Model) approach as defined by M/490 and IEC 63200, and based on (1) the IoT smart home/building and smart energy system reference architecture defined by InterConnect project (see D2.1 of InterConnect), in particular its Semantic Interoperability Framework, and (2) the Data Exchange Reference Architecture (DE-RA 2.0) developed within BRIDGE Data Management WG.

Cybersecurity and privacy practice and user acceptance criteria (si apre in una nuova finestra)

Produced by task T3.3Description of cyber-security and privacy required capabilities and a coordinated security and privacy-by-design practice, based on relevant reference architectures, ISO standards (such as 27xxx series), NIST guidelines for smart grid cyber-security (NISTIR 7628), EC recommendations on cybersecurity in the energy sector (SWD (2019) 1240 final) and EU network code on cybersecurity.

Use-cases scenarios and requirements (si apre in una nuova finestra)

Produced by task T2.2Description of potential use cases and selected subset for pilot demonstration, based on PARMENIDES Flexibility strategies and on opportunities and constraints from pilots. Description of technical, economic, and social Key Performance Indicators (KPIs). Definition and description of transversal requirements to be fulfilled by each of the components of the system.

Interoperability framework (including PECO) and semantic interoperability (si apre in una nuova finestra)

Produced by task T3.2Description of concepts and best practices from the ISO/IEC 21823-3 “IoT Semantic interoperability” standard. List of existing ontologies providing the baseline for PARMENIDES Energy Community Ontology (PECO), description of PECO and the used ontology developoment process and ontology validation results.

Pubblicazioni

PARMENIDES – Ideal Voltage Sensory Placement for Battery Storage Operation Optimization (si apre in una nuova finestra)

Autori: David Fellner, Mark Stefan, Bharath-Varsh Rao, Sarah Reisenbauer, Maria Aigner, Gregor Taljan
Pubblicato in: CIRED 2024 Workshop, 2024
Editore: IET
DOI: 10.1049/icp.2024.1878

PARMENIDES – Enabling Flexibility Provision in Renewable Energy Communities through an Ontology-driven Interoperable ICT Architecture

Autori: Mark Stefan, Milos Sipetic, Fabrizia Giordano, Jawad Kazmi, Lorenz Payonga, Hatef Madani, Dune Sebilleau, Leo Cornec
Pubblicato in: CIRED 2024 Workshop, 2024
Editore: to be published

È in corso la ricerca di dati su OpenAIRE...

Si è verificato un errore durante la ricerca dei dati su OpenAIRE

Nessun risultato disponibile

Il mio fascicolo 0 0