Periodic Reporting for period 1 - FP6 - FutuRe (Europe’s Rail Flagship Project 6 - Delivering Innovative rail services to revitalise capillary lines and Regional rail services)
Periodo di rendicontazione: 2022-12-01 al 2023-12-31
Unfortunately, many of these routes were abandoned in the past - mainly due to high costs.
Therefore, these rail lines need to be revitalized or even renewed to make them economically, socially and environmentally sustainable and to meet current customer needs and challenges The overall objectives of the FutuRe project are to ensure the long-term viability of the regional railway by reducing the total cost of ownership (TCO), while ensuring high service quality and operational reliability. It also aims to increase customer satisfaction and to make rail an attractive and preferred mode of transport.
Therefore, the main objectives of FutuRe are: lowering CAPEX system costs, increasing productivity by lowering OPEX (unit costs per train kilometer), and improving customer satisfaction. These goals are to be achieved through a concept tailored to regional railways but transferable across Europe, encompassing digitalisation, automation and the use of common and new technologies for signaling and track components, rolling stock and customer information. Cost drivers such as infrastructure and energy components, e.g. trackside train detection (axle counters, etc.) and level crossing control systems, will be replaced by less costly wireless and energy autonomous components. In addition, a modular and standardised vehicle concept specifically tailored to the requirements of regional lines becomes needed, as well as a range of attractive services.
- provide first input to the System Pillar.
- provide first input to the Innovation Pillars (specifically Destination 1, Destination 2, Destination and 4).
- contribute to set-up KPIs modelling and related reference baseline.
- contribute to define the basis for input to STIP.
Through the activities performed under the WP2 framework that ensured coordination, harmonisation and consolidation of the results.
Coherently to MAWP Flagship Area 6 objectives, the developed technical content addressed the Regional System Solutions (WP2) that integrated the specificities for CCS and related Operations (WP3, with contribution through WP2 of WP5 for G2 Lines), Regional Railway Asset (WP4), Rolling Stock (WP5) and Customer Services (WP6) showing that the proposed concepts goes toward the lowering of total cost, the increasing of the railway system productivity and the improvement of customer satisfaction.
The execution of such synergic activities between the WP2 and the other work packages paved the way to make these latter developing more specific requirements during the next reporting period, as basis for the related project deliverables. That is also functional to the consolidation and widening of the interaction with the System Pillar and the other Innovation Pillars (Destination 1, 2 ,4).
During the second part of the 1st reporting period, the project started the development of a methodology to manage the intended project KPI as per related DoA.
From that point of view, the project progresses as per original plans focalising on the achievements in the domains :
- Control and Command System including ATO GoA2/3/4.
- Communication infrastructure for wireless connection between trackside and field devices, 1Gbps train-to-track dedicated radio network, multi-bearer platform, train to cloud communication.
- Multimodal fueling station concepts for regional lines vehicles.
- Vehicle-centric train control for G2 lines.
- Passenger congestion monitoring & dynamic planning of travels and freight transport platform
To make the impact by such results tangible and effective in the future, a methodology for their exploitation has been developed addressing:
- Assessment at high-level the target market sectors and the potential beneficiaries of the results that can be effectively exploited.
- Define the Key Exploitable Results of the FP6 - FutuRe project, characterising the associated value proposition.
- Identify the routes to be followed for an effective exploitation.
- Establish how to manage the associated IPR.
- Consolidate the understanding of the project on the Technology Readiness Level of the intended results.
- Asses the associated risks, define the mitigation actions and the related follow-up.
- Propose an overview on the opportunities offered by the trends of future railways market.