CORDIS proporciona enlaces a los documentos públicos y las publicaciones de los proyectos de los programas marco HORIZONTE.
Los enlaces a los documentos y las publicaciones de los proyectos del Séptimo Programa Marco, así como los enlaces a algunos tipos de resultados específicos, como conjuntos de datos y «software», se obtienen dinámicamente de OpenAIRE .
Resultado final
- Stakeholder analysis document, Operational concept with use cases- System architecture description- Catalogue of trackside technical requirements for shunting (e.g. automated stationary brake tests, stationary parking brake functions and solutions for decoupling on the hump)- Catalogue of technical requirements for automated shunting movement without ETCS (radio control, localization, CCS interface)- Catalogue of required amendments to TAF-TSI (and other standards)- Interface and protocols specifications (incl. FA2 and FA3 as well as European Railway Checkpoints)
D2 3 Reference Freight System Architecture (se abrirá en una nueva ventana)Report on the overall FDFT System Architecture
D3 1 System Requirement Specification FDFT (se abrirá en una nueva ventana)Freight System requirement specification
D18 1 Test report for Powerline PLUS technology (se abrirá en una nueva ventana)Test Report Powerline Plus
D25 3 Report on the basic functional and technical specifications regarding CMS as relevant input for FP3 (se abrirá en una nueva ventana)Report on the basic functional and technical specifications regarding CMS as relevant input for FP3
D25 2 Report on the basic functional and technical specifications for Seamless Planning Dynamic Dispatching and Intermodal Prediction as relevant input for FP1 (se abrirá en una nueva ventana)Report on the basic functional and technical specifications for Seamless Planning, Dynamic Dispatching and Intermodal Prediction as relevant input for FP1
D29 1 Technical definition of the standard IVG for checkpoints and related demonstrators (se abrirá en una nueva ventana)This report will cover the following topics: demonstrator definition and start of development, prioritization of use cases and mitigation of regulatory barriers for harmonized procedures.
D2 2 FDFTO User Requirements Specification (se abrirá en una nueva ventana)User requirements describing the FDFTO
D25 1 Report on the basic functional and technical specifications for the realisation of the technical enablers of Seamless Freight also including the final specification input for FP1 (se abrirá en una nueva ventana)The deliverable contains the functional and technical specifications on enabler level. also including the final specification input for FP1. It follows the framework established in WP2. The report is structured according to the different enablers, with Seamless Planning and Dynamic Dispatching containing input which is used by different WPs in SG2 of the Destination FA1 project. will identify the data and use cases that can be shared with FP3. This will be in line with D7.2. BIS of FP3 in M13 “Analysis of the connection to FA5” which will identify the data that FP3 will request from FP5. Sharing of data is identified as a risk and mitigation strategies will be adopted.
D4 1 Authorisation strategy and overall safety plan (se abrirá en una nueva ventana)Authorisation strategy and overall safety plan
D5 2 Technical Specifications of Wagon and Locomotive DAC up to Level 5 (se abrirá en una nueva ventana)DAC Level 4, DAC Level 5, and Wagon/Loco coupler technical specification for interoperability including sketches with critical measurements for interoperability interfaces
D3 2 Physical reference system architecture FDFT (se abrirá en una nueva ventana)Document describing and specifying the physical reference system architecture
D3 3 Digital_Data reference system architecture FDFT (se abrirá en una nueva ventana)Document describing and specifying the digital/data reference system architecture
Publicaciones
Autores:
Adin, Iñigo; Morales-Ramiro, Jonan; Krüger, David; Laporte, Mathilde
Publicado en:
2024
Editor:
CEIT
Autores:
F. Thiery, P. Chandran, M. Rantatalo
Publicado en:
Civil-Comp Conferences, Proceedings of the Sixth International Conference on Railway Technology: Research, Development and Maintenance, Edición 7, 2024
Editor:
Civil-Comp Press
DOI:
10.4203/ccc.7.7.9
Autores:
G.S. Himmelbauer, T. Hasenleithner, M. Egger, B. Skok, A. Kaltenbrunner, B. Stadlmann
Publicado en:
Civil-Comp Conferences, Proceedings of the Sixth International Conference on Railway Technology: Research, Development and Maintenance, Edición 7, 2024, ISSN 2753-3239
Editor:
Civil-Comp Press
DOI:
10.4203/ccc.7.21.6
Autores:
David Krüger, Mathilde Laporte, Jonan Morales, Iñigo Adin, Björn Pålsson, Behzad Kordnejad, Ingrid Nordmark
Publicado en:
2024
Editor:
CEIT
Autores:
K. Mattsson, J.C.O. Nielsen, L. Fehrlund, M. Maglio, T. Vernersson
Publicado en:
Civil-Comp Conferences, Proceedings of the Sixth International Conference on Railway Technology: Research, Development and Maintenance, Edición 7, 2024
Editor:
Civil-Comp Press
DOI:
10.4203/ccc.7.7.10
Autores:
Patrick Seeßle, Daniel Wolfram, Andreas Haller, Florian Einsele, Victoria Jäger, Simon Funke
Publicado en:
Transport Transitions: Advancing Sustainable and Inclusive Mobility, Proceedings of the 10th TRA Conference, 2024, Dublin, Ireland - Volume 2: Sustainable Transport Development, 2025, ISSN 2196-5544
Editor:
Springer
Buscando datos de OpenAIRE...
Se ha producido un error en la búsqueda de datos de OpenAIRE
No hay resultados disponibles