Skip to main content
Vai all'homepage della Commissione europea (si apre in una nuova finestra)
italiano italiano
CORDIS - Risultati della ricerca dell’UE
CORDIS

Buildings as Efficient Interoperable Formers of Clean Energy Ecosystems

CORDIS fornisce collegamenti ai risultati finali pubblici e alle pubblicazioni dei progetti ORIZZONTE.

I link ai risultati e alle pubblicazioni dei progetti del 7° PQ, così come i link ad alcuni tipi di risultati specifici come dataset e software, sono recuperati dinamicamente da .OpenAIRE .

Risultati finali

WeForming Services Co-Creation, Business Models, Functional Specifications and Reference Architecture (2nd version) (si apre in una nuova finestra)

This deliverable will provide an update of Deliverable 2.2. It will deal with the user engagement awareness and co-creation. It will include a detailed description of the business models that the project will develop for building to grid integration. It will detail the functional specifications for interoperability and standardized data integration between iGFBs and their energy eco-system. Finally, this deliverable will include a second description of the W-IBRA reference architecture. Success Criteria: Definition of services and design of the Architecture. Tasks (2.4, 2.5, 2.6, 2.7). This will be the second version of this deliverable.

Communication and dissemination plan and branding (si apre in una nuova finestra)

Communication and dissemination planThis deliverable will define and present in detail the plan for the dissemination and communication activities of the whole WeForming project. Success criteria: Availability of a concrete plan with specific milestones and KPIs. Task 7.1.

SOTA analysis, barriers, regulatory framework and end-users’ requirements (si apre in una nuova finestra)

This deliverable will include an extensive analysis of the state of the art in the energy storage solutions domain. It will make an elaborate presentation of the barriers that hinder the wide-spread deployment of the different forms of storage. Within this deliverable the regulatory framework surrounding Energy storage will be reviewed and assessed and finally the document will include a detailed presentation of the use-cases coming partially from the project pilots. Success Criteria: The definition of the use-cases. (Task 2.1, Task 2.2, Task 2.3).

WeForming Services Co-Creation, Business Models, Functional Specifications and Reference Architecture (1st version) (si apre in una nuova finestra)

This deliverable will deal with the user engagement awareness and co-creation. It will include a detailed description of the business models that the project will develop for building to grid integration. It will detail the functional specifications for interoperability and standardized data integration between iGFBs and their energy eco-system. Finally, this deliverable will include a first description of the W-IBRA reference architecture. Success Criteria: Definition of services and design of the Architecture. Tasks (2.4, 2.5, 2.6, 2.7). This will be the first version of this deliverable.

WeForming demos’ execution documentation (pre-demo operations) (si apre in una nuova finestra)

This deliverable will document all details surrounding the operation of the project pilots during the pre-demo phase and will provide all the necessary documentation.General and technical details about the demo deployment, the on-site details, the scenarios, the integration and the initial operation will be documented. Early results will be identified.Success Criteria: Availability of the report in terms of the pre-pilot scope. (Tasks 5.2, 5.3, 5.4, 5.5, 5.6, 5.7).

WeForming software building blocks and technological enablers (digital platforms, digital twins, BIM/SRI models, AI/ML tools) (1st technology release) (si apre in una nuova finestra)

This Deliverable will include the first version of the WeForming Software Building blocks and Technological enablers and will deal with their specification, design and development. It will include the proprietary digital platforms and tools that already exist in the pilots and deal with their extension to fit to the WeFroming Framework. It will also design digital and data models for the digital twins and BIMs and finally the AI/ML tools for iGFBs. This will be the first version of this deliverable. Success Criteria: Operational versions of all software technological enablers of W-IBRA (partial functionality - 1st Release)Tasks: 3.1, 3.4, 3.5

Communication, dissemination, exploitation and market exploration, standardisation and community building (1st progress report and plan) (si apre in una nuova finestra)

This document will report the dissemination, communication and exploitation activities performed during the first 18 months, the results achieved and an updated version of the respective plans. Standardisation activities will be documented and the enterpreneureal engagement weill be discussed in terms of concrete activities. Finally, the clustering activities with other projects and Initiatives of the EC will be documented. Success Criteria: The document should report the achieved results and the new/updated plans.(Tasks 7.1, 7.2, 7.3, 7.4, 7.5)

WeForming hardware building blocks and technological enablers (real-time controller, processing hubs) (1st technology release) (si apre in una nuova finestra)

This Deliverable will include the first version of the WeForming Hardware Building blocks and Technological enablers and will deal with their specification, design and development. It will include the real-time controller which will coordinate the multi-energy asset operation of iGFB components. Moreover, this deliverable will include the design and development of the processing hubs for the flexible interaction of iGFBs with the distribution network. This will be the first version of this deliverable. Success Criteria: Operational versions of all hardware technological enablers of W-IBRA (partial functionality - 1st Release)Tasks: 3.2, 3.3.

WeForming integrated platform (catalogue of services, data space connector, middleware, integrated solution) (1st technology release) (si apre in una nuova finestra)

This Delivarable will include the first description of the interoperability enablers of the WeForming Framework. It will detail the catalogue of services, the data space connector, the WeForming middleware and the whole integrated system as well as the security, privacy and data sovereignty considerations. This will be the first version of this deliverable. Success Criteria: Operational versions of all interoperability technological enablers and successful integration into the W-IBRA digital platform (partial functionality - 1st Release)Tasks 4.1, 4.2, 4.3, 4.4, 4.5.

Data Management Plan (si apre in una nuova finestra)

This Deliverable will summarize the Data management and IPR protection procedures that will be followed during the course of the project. It will provide the analysis of the Data management policy and the Data management lifecycle for the datasets that will be collected, processed or generated by the project. Success Criteria: The availability of the report. (Task 1.4).

Pubblicazioni

Virtual Energy Storage Stacking in Day-Ahead and mFRR markets - A Spanish Case Study (si apre in una nuova finestra)

Autori: Ángel Paredes, José A. Aguado, Pedro Rodríguez
Pubblicato in: 2024 IEEE 15th International Symposium on Power Electronics for Distributed Generation Systems (PEDG), 2024, ISSN 2329-5767
Editore: IEEE
DOI: 10.1109/PEDG61800.2024.10667432

Operation Maps for Hybrid Electrolyser and Battery Systems - A Luxembourgish Case Study (si apre in una nuova finestra)

Autori: Ángel Paredes, José A. Aguado, Philipp Fisch, Patrick Witte, Sebastian Theissen, Pedro Rodríguez
Pubblicato in: 2024 IEEE 15th International Symposium on Power Electronics for Distributed Generation Systems (PEDG), 2024, ISSN 2329-5767
Editore: IEEE
DOI: 10.1109/PEDG61800.2024.10667442

Forecasting and Optimization as a Service for Energy Management Applications with the Energy Service Generics Framework (si apre in una nuova finestra)

Autori: David Wölfle, Hartmut Schmeck
Pubblicato in: ACM SIGEnergy Energy Informatics Review, Numero 4, 2025, ISSN 2770-5331
Editore: Association for Computing Machinery (ACM)
DOI: 10.1145/3717413.3717439

Power-Dependent Price Profiles - Defining Grid- and Market-Oriented Incentives for Building Energy Management Systems (si apre in una nuova finestra)

Autori: Tobias Riedel, Carl Hauschke, Hartmut Schmeck
Pubblicato in: ACM SIGEnergy Energy Informatics Review, Numero 4, 2025, ISSN 2770-5331
Editore: Association for Computing Machinery (ACM)
DOI: 10.1145/3717413.3717420

Hosting capacity in the Croatian regulatory environment (si apre in una nuova finestra)

Autori: Tomislav Antić, Tomislav Capuder
Pubblicato in: IET Conference Proceedings, Numero 2024, 2025, ISBN 978-1-83724-122-4
Editore: Institution of Engineering and Technology (IET)
DOI: 10.1049/ICP.2024.1904

Modelling And Simulation Of A Carnot Battery Coupled To Seasonal Underground Stratified Thermal Energy Storage For Heating, Cooling And Electricity Generation

Autori: Aitor Cendoya, Frederic Ransy, Vincent Lemort, Andres Hernandez, Pierre Dewallef, Pierre-Henri Gresse and Jacques Windeshausen
Pubblicato in: 2024
Editore: Herrick Laboratories, Purdue University

The role of demand-side flexibility in harmonics-considered dynamic hosting capacity (si apre in una nuova finestra)

Autori: Tomislav Antić, Tomislav Capuder
Pubblicato in: IET Conference Proceedings, Numero 2024, 2025, ISBN 978-1-83724-122-4
Editore: Institution of Engineering and Technology (IET)
DOI: 10.1049/ICP.2024.1902

On the participation of energy storage systems in reserve markets using Decision Focused Learning (si apre in una nuova finestra)

Autori: Ángel Paredes, Jean-François Toubeau, José A. Aguado, François Vallée
Pubblicato in: Sustainable Energy, Grids and Networks, Numero 42, 2025, ISSN 2352-4677
Editore: Elsevier BV
DOI: 10.1016/J.SEGAN.2025.101677

Sustainable Energy, Grids and Networks (si apre in una nuova finestra)

Autori: Tomislav Antić, Andrew Keane, Tomislav Capuder
Pubblicato in: Sustainable Energy, Grids and Networks, Numero 39, 2024, ISSN 2352-4677
Editore: Elsevier Limited
DOI: 10.1016/J.SEGAN.2024.101473

Learning a reward function for user-preferred appliance scheduling (si apre in una nuova finestra)

Autori: Nikolina Čović, Jochen L. Cremer, Hrvoje Pandžić
Pubblicato in: Electric Power Systems Research, Numero 235, 2024, ISSN 0378-7796
Editore: Elsevier BV
DOI: 10.1016/J.EPSR.2024.110667

È in corso la ricerca di dati su OpenAIRE...

Si è verificato un errore durante la ricerca dei dati su OpenAIRE

Nessun risultato disponibile

Il mio fascicolo 0 0